Iteration 4: Restart
My third iteration was a big bust. I have re-planned, but there is very little different from my iteration 3 plan. I have chosen the same 4 items from my Work Queue. I have updated the tasks slightly based on experience from the last iteration so that I have 22 tasks. Even with more tasks, I have actually reduced scope slightly so that the tasks are finer-grained.
It was difficult getting around to doing this. I "wanted" to slide back into old habits of just doing whatever I felt like. I found myself spending way too much time doing email stuff.
Re-committing to the same plan (with minor changes) as the last iteration is difficult because I'm feeling slightly demoralized. Still, I think that it has a good chance of succeeding because I actually don't have any major commitments this week other than work.
Wish me luck!
Related articles can be found in the following categories:
Agile Case Studies
I also maintain a page of references and recommended links to materials related to agile methods.
Posted by Mishkin Berteig at January 23, 2007 03:33 PM