September 24, 2007
Agile Benefits: Five Essential Reasons to Try Agile
Although there many other benefits of agile, and although those provide us with other reasons to try agile, the five essential benefits of agile are:
Rapid Learning - disciplined application of the scientific method to explore the best ways to deliver valuable results.
Early Return on Investment - opportunity to use the results of work starting with the work delivered at the end of the first iteration.
Satisfied Stakeholders - engagement in the process in a way that allows meaningful contributions from all stakeholders.
Increased Control - mechanisms to track/measure and therefore steer the direction that work is going so that it meets goals.
Responsiveness to Change - processes, tools, roles and principles that allow a team and an organization to embrace change rather than reject, control or suffer from change.
These reasons are sufficient and apply to operations work, project work and open-ended research work, whenever humans are involved. The above links take you to more detailed descriptions of each of these benefits.
What are some of the other benefits of agile?
Posted by Mishkin Berteig at 10:47 PM | |
September 11, 2007
Agile Benefits: Early Return on Investment
We wouldn't do agile if we didn't think it was better in some way. More and more, I am seeing the adoption of agile methods being driven by business management (rather then engineering). There is a clear reason for this: agile methods offer the possibility of early return on investment compared to other methods of working. This benefit is only one of five essential benefits of agile, but it is one of the most practical and easiest to measure. Therefore it is important to clearly understand how agile methods can deliver this benefit... and how they can fail to do so!
Early Return on Investment
The basic process structure of agile methods consists of the short cycles (iterations, Sprints) of delivery of valuable results. The key word there (aside from "short") is "Valuable". Now in software, "valuable" is relatively easy to define. One definition that works nicely is "Running Tested Features". In other industries or types of work, valuable is defined in some other way.
An agile process delivers valuable results every single iteration. This provides the basis of early return on investment. The organization can then take those results and start to realize their benefits immediately after the very first iteration... ideally... (which we will come back to in a moment).
Here's a graphical contrast between a traditional waterfall approach versus an agile approach that maps value delivered vs. time.

The waterfall project delivers all its value at the end - the red spike. An agile project starts delivering value very early on, increases to a maximum rate of value delivery and then gradually tapers off. The reason for the shape is simple: at the start of the project there is often a fair amount of uncertainty, and some dead-ends are pursued before getting to the really valuable work, and then as that work is completed, the team starts working on lower and lower priority features.
The early delivery of value has an additional benefit. By delivering value early, the time value of that investment is increased. Revenue or cost savings can be realized sooner and therefore more funds are feed up for other investment.
Sounds great, what's the catch?
Agile Pitfall: Not Getting Done
This benefit being realized rests completely on the assumption that the work delivered at the end of each iteration is actually valuable. If for some reason it's not, then this benefit falls apart completely. Most organizations when starting with agile, cannot realize this value immediately because their teams do not deliver completed valuable results. Rather, most organizations are set up so that a team delivers an intermediate result which is useless on its own. Realizing this benefit of agile methods often requires substantial, strenuous, disciplined change in the way that people work, teams are set up, bureaucracy functions, and management supports it all. Perfecting agile is sometimes a lengthy process. Fortunately, the other benefits of agile do not depend so heavily on this assumption.
Agile Benefits: Rapid Learning
Agile Benefits: Early Return on Investment
Agile Benefits: Satisfied Stakeholders
Agile Benefits: Increased Control
Agile Benefits: Responsiveness to Change
Agile Benefits: Summary Article
Posted by Mishkin Berteig at 03:08 PM | |
August 18, 2007
Agile Management Tools
Ah, tools...
For agile training and consulting, I always recommend starting with the standard physical tools of note cards on a wall plus a whiteboard and digital camera. However, I am still interested in what tools people have used when they have found that note cards are not sufficient. Here is a list of the tools that I am aware of, as well as a link to a survey...
This list is in alphabetical order:
Custom In-House Tool
Defect/Enhancement Tracker (e.g. Jira)
Spreadsheet
Wiki (e.g. Fitnesse)
The survey is extremely short (four questions) and will be closed on Sept. 15th:
Click Here to take the Agile Management Tools survey
I will publish the results here.
If you know of other tools (open source, products, etc.) please let me know in the comments!
Here are more tools for managing agile projects/requirements/planning that have been mentioned by folks in the comments:
Thanks to everyone for including the urls in the comments!!!
Posted by Mishkin Berteig at 02:36 AM | |
August 01, 2007
Agile Estimation and Pairing
I just read a recent article on PMHut called "Schedule Questions: Pair Programming and the PNR Curve". There is much in this article that is important for agile project management... and much that should be avoided at all costs!
Estimating Projects
The bulk of the article is an explanation of the PNR curve (Putnam Norden Rayleigh curve). The explanation is sufficient and can be checked against other web articles about software estimation. The basic idea of the PNR curve is to find an ideal number of people with which to staff a project based on an estimate of overall project size (e.g. 72 man-months).
Take a moment to go read Fantasy Estimation (the comments here provide good additional material).
It should be clear now that any initial sizing estimate based on units such as man-months is ridiculous. So what is our alternative? What about an agile approach to estimation and planning?
Agile Estimation
Well, at a minimum, in an agile approach to estimation, we need to resolve some of the problems identified in "Fantasy Estimation". So, we:
- Get the whole team that will be doing the work to do the estimation
- We weight estimates based on team maturity, knowledge of tools, knowledge of the business domain and the physical proximity of team members to each other
- We adjust our estimates of work remaining based on our results for work completed
The great thing about an agile approach is that it allows all these things to be done and to be done well. Scrum has a specific set of "Drag Factors" that can be used to weight the team's estimates. And using a team's past estimates vs. "actuals" is possible on an iteration by iteration basis... and this is possible because every iteration the team is doing the "same thing": delivering an increment of valuable results (working software, edited video, organizational change, whatever is contributing to the project goals).
The other thing that agile methods allow is to make a distinction between estimation for planning and estimation for commitment.
So. It's cool to learn about the PNR Staffing curve and the thinking behind it. It's a little scary to see it being applied in an agile context when we have tools that are much better.
Pairing and Estimation
At the end of the PMHut article, the author, Mike asks a question:
What about pair programming? When using pairs on a team we could either:
- Continue as is, use the model to determine optimal team size and then encourage pairing to increase efficiency.
- Treat a pair as one hyper-effective person, so count pairs not individuals and increase team sizes accordingly.
This second option seems counter intuitive to agile, we strive for small teams to reduce communication channels, so I’m not convinced by this idea. I would be very interested to hear people’s thoughts on agile staffing curves. So, lots more questions than answers in this post, please let me know if you have any research or thoughts on the matter.
I wrote in response:
Mike, I feel like the options you present in your question at the end actually miss the true point of pairing… which has to do with communication. I have never seen pairing done in such a way that two people always work together as a pair. Rather, pairing is promiscuous: people switch pairs frequently throughout a day, iteration or project. This switching has two communication effects: 1) the human interaction and gradual diffusion of information as people switch pairs 2) helping everyone understand all parts of the work as a result of frequently working on many different things. From an estimation standpoint, I expect that neither of your two options is quite right. Rather, the third option is to continue as is with existing estimation and then encourage pairing to increase communication. Increased communication shows up in a number of different ways, not just efficiency: risk mitigation, accelerated individual and team learning etc.
I would like to expand on this just a little. To me, pair programming or pair work of any kind has always been able to provide a number of benefits to projects. Problem avoidance is one benefit (lower defect rates, better code quality through constant inspection, spotting each other). Better communication is another benefit. Increasing the Truck Factor is yet another benefit.
None of these benefits have any direct bearing on estimating a project at the start, particularly since most projects sacrifice quality for schedule. From an agile perspective, since planning estimation is not commitment, it actually doesn't even really matter! Get a conservative estimate for you project using whatever method you like, then start working and get a commitment velocity and see what the team can really do.
Posted by Mishkin Berteig at 10:04 AM | |
February 22, 2007
Strategic Plan
Okay, this is only marginally related to agile, but I thought it was interesting nevertheless: How to Write a Detailed Strategic Plan. The main connection to Agile Work, is that you need to have a clear performance goal in mind towards which you are working. This may be a great way to clarify your thoughts about such a goal.
Posted by Mishkin Berteig at 11:43 AM | |
January 27, 2007
The Freedom of Limited Capacity
Something that I would have thought impossible has happened. By understanding how incredibly limited my capacity to do work is, I am getting a greater and greater sense of freedom and contentment.
My "experiement" to run my business using Agile Work practices is starting to bear some fruit. The trouble is, that so far, that fruit is simple better knowledge of my extremely limited capacity to get things done during a single week-long iteration. I can do 3 or 4 items from my Work Queue which works out to about 15 or 20 tasks. This seems ridiculous to me! Surely one hard-working guy can get more than that done!
But I can't. I'm getting to the end of my fourth iteration and it's the same thing again!
I know some of the reasons for this: interruptions, unexpected work, unremembered work, and my general nature of being easily distracted by shiny things!
In some ways this has been quite frustrating. I have a huge queue of work I want to get done for my business. But the other side of the coin, the one that looks different than I expected, is that knowing just how limited my capacity is... is liberating! I don't feel nearly as stressed as I did four weeks ago. I have the courage to commit at an appropriate level. I can start to believe my plans. I can see - realistically - just how much I need help to achieve my goals. I can see how soon I will be able to do cost/benefit analysis on hiring vs. doing the work myself (can't do that yet). I can even start to believe that I might be able to reach my original goal of reducing my working hours from 80+/week to 50 or less... as long as I make sure that my Work Queue is properly prioritized with that goal in mind.
I have worked with a number of teams that have gotten to this point of certainty about their capacity. I've seen this happen in others... and now I recognize it for what it is: relief. One team I worked with after only two iterations had a very clear idea of their capacity, and you could feel the comfort level of everyone with this new agile thing skyrocket. Another team I worked with got a clear sense of its capacity after only three iterations. This team settled in and then started to work to increase their capacity and did a fabulous job by using automation tools, eliminating various organizational bottlenecks, etc. They wow'ed the rest of the organization with their incredible, consistent delivery of value. One of my former students, Dmitri Zimine, gave a presentation at the XPToronto group where he talked about the incredible level of trust that developed between his team and the rest of the organization after consistently, iteration after iteration after iteration meeting their commitments.
All of this is only possible by a rigorous application of timeboxing, careful and consistent task breakdown, and good, honest tracking of results. I wrote a previous article called Seventeen Tips for Iteration Planning. Look it over and see what new ideas you can apply in your situation. If you are frustrated by a team continually over-committing, you will find a lot of valuable advice there.
As a parting shot: consider how you feel right now. Are you stressed out? Over committed? Failing to meet your commitments? Feeling guilty? Working insane hours? Not spending enough time with your family? Killing yourself!?
What about the team or organization you work in? Is it constantly being bombarded by problems it can't handle? Surviving on pure heroics?
I can't tell you that following a careful iterative planning approach will fix your problems... but I can tell you that it will reduce your stress levels, help you (or your organization) make appropriate commitments, and let you see the reality of your situation (good or bad).
Posted by Mishkin Berteig at 03:07 AM | |
January 08, 2007
Planning Iteration 0002 "Capacity"
I've completed my iteration planning for my second iteration. As a reminder, I'm doing this because I want to be working only 50 hours per week by July 2007. My sole improvement item from last iteration was to use get better at committing to an amount of work within my capacity. Here's what I have planned:
I have included my complete list of work to be done broken down into tasks. It is anonymized:
Client1 Proposal Writing
- 1 day intermediate team course
- phone consult details
- QA/tools coaching
- email proposal
Client2 Invoice
- get template from them
- collect hours
- collect receipts
- image receipts
- currency convert receipts if needed
- type up hours
- type up receipts
- email/submit
Client2 work
- 4 hour task
- 4 hour task
- 4 hour task
- 4 hour task
- 4 hour task
- 4 hour task
- 4 hour task
- 4 hour task
India Training
- ping Contact1 "V"
- ping Contact2 "N"
- ping Contact3 "M"
- ping Contact4 "S"
- ping Contact5 "V"
- air reservations
- prepare visa application
- submit visa application
- hotel reservations
Client3 Statement of Account
- equipment
- invoice 1
- invoice 2
As you can see, I have committed to only five items off the Work Queue for this iteration and they add up to thirty-two tasks. This is more than I indicated last night in my retrospective results. I'm nervous about this in two ways. One, I think that I am under-committing and that I'll get into huge trouble if I don't do more than this. Two, I think that I'm over-committing and that with my brother visiting, even doing this much smaller amount of work will be challenging. Still, I have tried to make both the items from the Work Queue and the tasks smaller than in my previous iteration. I guess I'll see in a week!
Posted by Mishkin Berteig at 11:01 AM | |
First Interation Ending
My first iteration using Agile Work for my business development has come to a close. Here is what I did for a "demo" and retrospective.
Demo
This was simple. I looked at my selected Work Queue items and my tasks and check to see what I had accomplished (finished or partially finished). Here are the statistics (grim and discouraging as they are):
For Iteration 001 - "Beginnings":
# Work Queue Items At Start: 11
# Work Queue Items Completed: 2
# Tasks at Start: 43
# Tasks Remaining: 28
From these numbers, for my next iteration I should probably be hesitant about committing to any more than 2 items from the Work Queue and any more than 15 tasks.
Considering how many work hours I have in a week, 43 tasks is absolutely ridiculous... unless they are really small, which many of them weren't. For example, I had one task as "Integrate part one of Alexei's feedback into my eBook" which when I did it actually took about three hours. Its just one sample, but 3 x 43 is 129 hours and is just not possible for a single human being in 7 days.
Aside from the value-oriented items from the Work Queue, I also did the work to finish a more complete Work Queue. It now has 37 items including those which remain un-finished from this first iteration. It is poorly prioritized, but that will improve over time. As well, I suspect there are quite a few things missing that I forgetting. I should probably get my wife, Melanie, to look over it and make some suggestions. I also have some old "to do" lists for my business which might remind me of some things to add onto it near the bottom.
Retrospective
I did a little mini-retrospective to find the three things that went well this iteration, and the three things that need improvement. I also decided on a clear action item to take to try to improve my next iteration. (Another clear reason to use Card Meeting - worked great for my retrospective :-) .)
Three Things that Went Well:
- Referred to my iteration tasks frequently. I kept my TiddlyWiki up in my browser and checked it several times a day.
- Spent time with my family and friends despite huge workload. We had guests and family visiting and I got some good time in with them. I also spent a good amount of time with Melanie and my kids. I had to make a conscious effort to do this, but since this is the goal of my using Agile Work (to have a good life/work balance), I figured I might as well start making some progress on it right away!
- Had courage to do some development work which required changes to other developers' work. I ran into a problem with some of the work I am doing as a contract. I dug around and realized that any fix I made would be felt by other parts of the codebase as API's changed. I made the fix and then tracked down the dependencies and fixed everything up. Fun!
Three Things that Need Improvement:
- Pay more attention to my schedule / calendar so as to reduce problems with work/family boundaries. Still a loooooong way to go on this one!
- Spend more work time "on-task", rather than on things not on my list. I ended up doing a bunch of work stuff that wasn't in my iteration plan. Partly I did it because I got bored of what I had planned, and partly becuase I forgot to focus on my plans. It would probably help if I had a Process Facilitator breathing down my neck :-)
- Make realistic plans given my capacity for work. This is the biggie! It is going to be very hard for me to keep to a small commitment. But considering the my brother is visiting from Beijing with his wife this week and next, I really have to try to get this right.
It is that last point that I will use as the basis for my next improvement. For my next iteration planning meeting (to be held in the morning after a far-to-brief sleep), I will commit to a maximum of 3 items from the Work Queue. This may mean breaking the items down into smaller bits. I'll talk with the Queue Master (myself) tomorrow morning about it :-)
Posted by Mishkin Berteig at 04:37 AM | |
January 02, 2007
Top Ten Most Popular Entries from 2006
If you are new to Agile Advice, these are not just some of the most popular articles, they are also some of the best! Take a look around; you will find ideas to inspire you, challenge your thinking and maybe that one little thing that will make the difference in applying agile methods in your situation.
1. How Two Hours Can Waste Two Weeks - 25,617 unique views
This little hypothetical story by Dmitri Zimine was very popular on Reddit, and Joel on Software ranted a bit about it.
2. The Case for Context Switching - 2,936 unique views
My rebuttal to Joel's rant. Goes well with Dmitri's article. Emphasizes the idea of building trust in an organization.
3. The Qualities of an Ideal Test - 1,579 unique views
Six qualities that will help make your tests as valuable as can be. Similar to the ACID properties of databases or the INVEST properties of user stories.
4. The Pros and Cons of Short Iterations - 1,555 unique views
A few words that will help you decide how long to make your iteration length. This is an important decision, and most teams and organizations don't know the factors involved.
5. Five Signs of Trouble in an Iteration - 1,489 unique views
A good howto on using burndown charts to discover problems in an iteration.
6. Seventeen Tips for Iteration Planning - 1,427 unique views
A good list of hints and tips that can make the difference between struggling with iteration planning and having it go smoothly and effectively. This is a key part of the Agile Work process, so getting good at it is a high priority for any team new to Agile Work.
7. Change is Natural - "Embrace Change" - 1,397 unique views
A short riff on the universality of change. Also introduces the idea of the "horizon of predictability".
8. The Art of Obstacle Removal - 1,287 unique views
This is a good reference article on types of obstacles and methods for removing them... a critical practice for Process Facilitators.
9. The Seven Core Practices of Agile Work - 1,285 unique views
Agile Work is really quite simple. This is a concise list of the practices that make up this effective methodology.
10. Interview with Alistair Cockburn - Agile and House Renovations - 902 unique views
Applying agile methods to home and garden renovations! Learn a bit about how this luminary of the agile world has taken agile practices out of the software world and into the hardware world.
Posted by Mishkin Berteig at 06:32 PM | |
December 22, 2006
Technical Debt
Last night I was thinking more about the analogy of technical debt. In this analogy, design and quality flaws in a team's work become a "debt" that must eventually be paid back. This analogy is fantastic because it can be taken just a little bit further to understand just how bad defects are...
Debt is sometimes useful. Financial debt can be used for risk reduction, investment, and emergencies. But it can also cause problems. Too much debt becomes hard to manage. If debt maintenance costs more than revenue (minus other expenses), then you're going down!
Technical debt is a little different than financial debt.
Suppose I went into a boardroom full of high-power executives for some large company. (Never mind how I got there.) And I pitched this fabulous idea: I'll give them a bunch of money for them to use for operations, expansion, whatever. All they have to agree to is that I choose the interest rate when I ask for repayment... trust me!
I would be thrown out of that room so fast!
That is what we do when we encourage teams to take on technical debt.
There is no way to know the interest rate on a defect. Part of the cost of a defect is obvious: how much time and materials will it take to repair the immediate problem. (Although even that is often hard to measure.) But there are also lots of non-obvious and probably non-measurable costs. How much effort will it take to get to the root cause of the defect so that it doesn't occur a second time? How much will it affect our "goodwill" and thus reduce further and repeat sales? How much will the existence of one defect hide the existence of other defects (with their own costs)? How much will the defect demoralize the team and increase staff turnover or reduce productivity? How much of an opportunity will the defect create for competitors? How much will the defect increase maintenance and support costs?
In other words, every time someone asks a team to let quality slide, they are asking the team (and the organization) to take on debt with an unknown interest rate. Which is lunacy.
Read more about this:
Voluntary Technical Debt - James Shore talks about a situation where a conscious decision to take on technical debt led to positive results.
Technical Debt: The Threshold of Acceptable Pain - Steve Bate talks about skill and sensitivity to technical debt. Here's a great quote from this article:
What if someone has a very high threshold of pain? I’d expect to see lots of crud (technical debt) in their code.... The high threshold developer doesn’t mind spending weeks on new features that would otherwise require days or hours with clean code. And they don’t mind staying at work all night fixing bugs before a major release or spending countless hours babysitting the production system after it’s been released. It doesn’t seem to bother them to spend significant time away from family and friends or to have limited time or other interests and hobbies. ...they sometimes experience pleasure at being the “hero” who saved the company from the bugs they created.
An Incremental Technique to Pay Off Testing Technical Debt - Johanna Rothman talks about technical debt and describes a simple risk-oriented approach to reducing it.
Posted by Mishkin Berteig at 08:23 AM | |
November 15, 2006
The Case for Context Switching
Recently, Dimitri Zimine wrote an excellent little story about context switching. Joel Spolsky writes in "From the 'You Call this Agile' Department":
Dmitri is only looking at one side of the cost/benefit equation. He's laid out a very convincing argument why Sarah should not interrupt her carefully planned two week iteration, but he hasn't even mentioned arguments for the other side: the important sale that will be lost.
Okay... I'll bite.
Let's look at that argument from the perspective of the sales person first since that is where Joel's concern starts:
The Sales Guy Perspective
"I need the 'ezhibal' feature now! Big bucks coming soon if we can get it now."
Let's suppose that this urgent email has come in somewhere near the start of our two week iteration. The normal response to this in Scrum is to push back a little. The ScrumMaster says something to the effect of: "Look if you wait 7 days we can put this on the top of the list for our next iteration."
First reaction, and it's a normal one, is for Sales Guy to freak out. I've actually heard people saying things like "You're going to lose your job over this! I'm getting the VP involved and he's not going to like it" and then they stalk off to find the big dog to come and bark at us. Anyway, let's pretend that the Sales Guy is willing to be reasonable and not instantly escalate the "problem". So what he actually says is: "Look, this is super important, it'll probably only take a few minutes for us to talk about it and then we can figure out how long it will take to fix. Let's just do a quick phone call and yadda, yadda, yadda, blah dee blah..."
Enough of the Sales Guy perspective.
Nowadays, if I'm in this situation, I do a value assessement. I tell the team to keep working on their plan, nothing's changed yet, and I sit down with Sales Guy and the person who's sponsoring the current work and we start a discussion about the options of which there are really only two that work in Scrum:
- Stay the Course
- Cancel the Iteration
First, let's talk about how we decide which option to take. Then we'll talk about why.
Deciding on the option is easy. You look at the value of the work currently being done and compare it to the value of the work that Sales Guy needs. You take into account probabilities. If Sales Guy doesn't have a signed contract, then it's hard to day if there's going to be any real revenue from the 'ezhibal' feature. Still, you might be able to do an assessment of the probabilities based on your level of trust and history with the client, etc. You also need to take into account the time value of money. Does delaying the current work have consequences for another client or stakeholder? What is the cost of those consequences.
This is a relatively simple cost/benefit analysis and comparison. If you're not comfortable with money and numbers and spreadsheets, you better get comfortable!
Okay, so we have a way of comparing the two bits of work. Now let's look at the two "allowed" responses and a third "bad" response.
Stay the Course
Turns out that the potential benefit of the stuff Sales Guy wants is not quite as high as the potential benefit of the stuff that Suzie Stakeholder prioritized for the current iteration. Well, that's easy. Put the request from Sales Guy in our prioritized list of work and get to it when there is an appropriate level of benefit relative to the other work.
Cancel the Iteration
The stuff Sales Guy wants is super-valuable. So let's get the whole team to stop what they are doing and everyone supports this very valuble work. Stopping the whole team is appropriate because obvioulsy, the stuff they're working on isn't as valuable. Oh, and because we treat a team as a unit in Scrum. And because the team needs to commit to work, not individuals. This isn't so obvious... more later.
Peel Sarah off to do the 'ezhibal' Feature
This is what normally happens, and in a "normal" non-agile environment, it's probably okay. In a non-agile environment, Sarah hasn't made any commitments (she's been forced to agree to dates and scope, etc., but she hasn't made a commitment that she is empowered to live up to). So if she goes off and does this one little thing, it probably will be just business as usual. In an agile environment, the team has made a commitment and doing this work this way invalidates the team's commitment.
Why do we do it this way? The main reason is around trust and commitment. Yup, it's that soft icky stuff that we're so incredibly bad at that customers think that bugs are normal, that management shoves the kitchen sink into projects in the frustrated hope that they'll get something out of the IT team at the end of the project. Sound familiar to anyone?
Anyway. An iteration is a commitment. It is a firm and solid commitment. The team as a group of smart and honorable people is making a definite commitment to the rest of the organization to get a certain amount of work done in a fixed amount of time. In return, management is agreeing to give the team every support in reaching this commitment. When a team is new at this, they might get it wrong. But having done this with dozens of teams now, I know that after a few tries, the team gets the hang of it and commits to appropriate amounts of work, and management provides appropriate levels of support.
This commitment is essential for developing trust. And anything that comes in the way of the team meeting its commitment is considered "BAD". An obstacle to do away with.
This is interesting, because Joel's second example is about defects. And I strongly agree that defects are "BAD" and need to be dealt with at a very high level of priority. The reason is simple: they prevent a team from meeting its commitment.
One team I was coaching was constantly bombarded by these types of it'll-just-take-a-few-minutes-need-it-asap requests. They had many stakeholders and very very limited resources to service these requests. They had several small projects that were taking literally years to do because they couldn't get enough concentrated time on any one thing. This was considered normal and good in their environment.
The trouble is, no one had really looked at the overall consequences. Everyone was doing local optimization. For us geeks, we all know that local optimization is something to be avoided if possible. We climb a peak only to discover that we have to climb back down a ways to get up to the higher peak we now see is next to this one. We climb up that one only to discover yet another higher peak even further along thus requiring us to climb down and up again... When really what we should have done is stepped back a ways, looked at the lay of the land and said, "hey, that peak over there is the highest of them all, let's go climb that one."
Scrum helps us avoid local optimization by forcing all feature requests for a team to be prioritized in a list of work, and by allowing the team to complete small pieces of work so it actually gets _something_ done that you can learn from.
Joel said:
Agile is not supposed to be about swapping out one set of bureaucratic, rigid procedures for another equally rigid set of procedures that still doesn't take customer's needs into account.
True enough! But it also demonstrates a serious lack of understanding about what is being done in Dmitri's example! First of all, without being agile at all, it is possible to switch from 18 month projects to two week projects. Both can be bureaucratic as you please (well, actually, there's only so much bureaucracy you can cram into two weeks and still get something done). The shorter projects will allow you to be much more responsive to customer needs... by definition!
So what happens when you add in all the other things that agile really is about? Transparency. Truthfulness. Creativity. Learning. Meta-Learning. Prioritization. Self-Organizating Teams. Eliminating Waste.
Well, first of what you get is something that's damn hard to do right. It goes against almost everything we've been taught to do: the extreme of heroics of the extreme of careful planning and process.
Secondly, what you get is something that needs safety zones and meta-rules. Like mutual, freely-given, team-to-stakeholders commitment. Like assuming positive intent.
And thirdly, what you get is an environment where not only is the business getting what it needs more than it used to, but also, the team likes working with the business, and the business likes working with the team.
I admit that the point Joel is making isn't too different. Yes: look at the costs and the benefits. But agile isn't quite about instantaneous responsiveness. That's a red herring and I'm suprised that Joel threw it's stinky carcass into the discussion. Agile is also about balancing that responsiveness with the overall view of value for the team and the organization. The tool for doing that is the prioritized list of work, not the email message from Sales Guy to Sarah.
Posted by Mishkin Berteig at 04:13 AM | |
November 12, 2006
More on Scaling Agile
One problem with having multiple teams working on the same project will be the tendency to compare the teams' performance. Why is this a problem?
Why Not Compare Team Performance?
One of the main reasons is that the teams need to be collaborating not competing. There can be a small amount of friendly competition that might come naturally, but as soon as management starts paying attention to differences in team performance, the competition starts to get serious.
In the case of multiple teams working on the same project, the goal should be to maximize overall performance, not individual team performance. Too much competition can lead to unintentional or deliberate sabotage: failed communication, incomplete communication and downright dishonesty.
Motivating Teams without Comparing Them!
As Mary Poppendieck has written, measure up [pdf]. In a single-team situation this means that individuals are measured and rewarded based on team performance (their sphere of influence). In a multi-team environment, that means that the group of teams should be measured as a group and compensated as a group. This will encourage all teams to work towards the success of the overall project. I personally believe there is some room for individual-based compensation, but the way it is handled needs to be done so that it does not encourage sub-optimal behavior.
As well, each team can keep track of their velocity. Some coaches recommend using "ideal hours" or some other units to determine velocity (velocity = estimated work remaining completed / iteration). The trouble with doing this with multiple teams is that there will be a very real tendency to want to compare each team's velocity. Since velocity is a useful measure for team capacity, it is important to still have a way to measure it. One simple way to do this to prevent comparison is to use different units for each team. Team One might be measuring velocity in Estimated Ping Pong Balls Completed / Iteration... Team Two in Estimated Bananas Completed / Iteration... Team Three in Estimated Bogo-MIPS Completed / Iteration... etc. etc.
Motivating Collaboration
First off, management must make visible commitments to eliminating barriers to collaboration. For example, it is a great sign of commitment to re-organize office spaces so that all the teams are sitting near to each other. Every time the Process Facilitator identifies an obstacle that relates to collaboration (tools, process, physical environment, etc.) management should get right on it and fix it.
An ongoing investment in team-building training, workshops and exercises is also helpful. This type of investment helps people gain the skills necessary to work effectively with other people. Again, individuals need to see and believe that management cares about and values teams.
Finally, one of my pet peeves: when a project is over, keep the team together! Do not break them up and redistribute your "resources" to other efforts. The value of those people working together is substantial. The value of those people working together as a high-performance team is incredible! In a multi-team situation, it is reasonable to take teams from the overall group and re-distribute their efforts... but just don't break up the individual teams.
Miscellaneous Notes on Scaling Agile:
Twelve is still the maximum recommended size for a single agile team. Seven is really the sweet spot. A team larger than twelve people just takes too long to get into the Performing stage of team development. If you feel like your project needs more than twelve people actively involved, then you probably want to split into two or more teams... and then you have "scaled" agile.
If you have three teams of five people (or some similar configuration of people just over the 12 person limit), then they will work as a very close-knit group and a lot of the time will act as if they were a single team. They will probably plan iterations and do demos and retrospectives together.
Twelve teams working on the same project at once is about the maximum number before communication overhead is slowing everyone down too much. This is largely a factor of trust: with 150 or fewer people involved in an effort, it is possible for everyone to know everyone. More than that many people and it is no longer possible. Trust is just not an option anymore and bureaucratic controls take over.
If for some reason you need to do something in a small amount of time and you think it's going to take more than twelve teams of twelve people...? Break the effort into smaller chunks. Divide and conquer. Division can be across functional areas, structural areas or time.
Although I have heard of agile methods being used with groups larger than this, I haven't heard any success stories :-)
Check out my earlier introductory article on Scaling Agile in a large project situation.
Dean Leffingwell has an article about practices needed for scaled-up efforts at the Agile Journal. I glanced through it, but I admit that after I disagreed with his very first point (Intentional Architecture), I started to pay less attention.
He claims that refactoring of large systems is not possible (or at least infeasible). The odd thing is, most large projects that I have been involved with are being done exactly because an old system is not refactorable. A large telecom system, a large insurance system, a large data warehouse and a large GIS system are all being done with scaled up agile methods exactly because the old systems that are currently in place have become ossified to the point where they must be replaced.
These old systems were originally built with phase-based development approaches. At some point, people stopped refactoring because they were not given the space to do so. This drop in code quality turned into technical debt. The technical debt accumulated to the point where it was unbearable (maintenance costs, cost of change, etc.).
The problem with intentional architecture is that it goes back to the old assumption that you can do a good design for a system without the constant feedback from review, deployment and use done on a very short cycle time. Over and over, we are faced with the painful consequences of this attitude, and that is one of the key reasons we started to work with agile methods in the first place.
Martin Fowler makes a good case that scaling agile is the last thing you should do. I don't disagree! Scale your agile teams at your own risk!
It's nice for me to be able to say that I've worked on some agile projects over $10,000,000 in size, but the fact is that the cost could have been reduced substantially if the team size was lowered and the deadline extended. It is (relatively) simple to do a cost/benefit analysis of cross-team-coordination-overhead vs. the time value of early delivery of more functionality... although I've never seen anyone do it! If you know of an example of an organization doing this in a realistic way, I'd love to hear about it!
Are there other ways of supporting cross-team collaboration that you have seen?
Posted by Mishkin Berteig at 09:13 AM | |
September 05, 2006
The Seven Core Practices of Agile Work
Agile Work consists of seven core practices. These practices form a solid starting point for any person, team or community that wishes to follow the Middle Way to Excellence.
Self-Organizing Team
Any group of people that wish to be an Agile Team need to take the initiative to determine for themselves how they are going to work (process) and how they are going to do the work (product). The term "team" really applies quite broadly to any size group of people that are working together towards a common goal.
Teams go through stages of development as they perform their work. The most important result of team development is the team itself, and not the specific skills and abilities that the individuals learn.
If the team is part of a broader organization, that organization must give the team the authority, space and safety to learn to be self-organizing. The organization's leadership is responsible for determining the "why?", some constraints on "how?", and then letting the team respond to the need as best as it can.
Also Known As: Whole Team (Extreme Programming), Cross-Functional Team (business management).
Deliver Frequently
Agile Work uses short fixed periods of time to frame the process of delivering something of value. Each of these iterations or timeboxes is structured so that the team or group actually finishes a piece of work and delivers it to stakeholders. Then, the team builds on what has previously been delivered to do it again in the same short amount of time.
The sooner that valuable results can be delivered, the more value can be obtained from those results. This extra value is derived from opportunities such as earlier sales, competitive advantage, early feedback, and risk reduction.
There is an explicit tradeoff: the shorter the time to delivery, the smaller the piece of value will be. But, like investing in one's retirement account, the earlier you start, even with small amounts of money, the better off you are in the long run.
Also Known As: Sprint (Scrum), Iteration (Extreme Programming), Timeboxing (generic), Time Value of Money (accounting).
Plan to Learn
Every type of work is governed by a Horizon of Predictability. Any plan that extends beyond this horizon of predictability is bound to fail. Agile work uses an explicit learning cycle tied in with the planning of work to accomodate this inevitable change.
First, a goal is required. This goal can be long-term. Teams using Agile Work then create a queue of work items to be done in order to reach this goal. Each iteration, some of these items are selected, finished and then the queue is adjusted. The changes in the work queue are based on external factors, and learning that the team does as it goes.
One of the most effective methods for the team to learn about how it is doing its work is the retrospective. After each delivery of results, the team holds a retrospective to examine how it can improve.
Also Known As: Inspect and Adapt (Scrum), Kaizen (Lean), Adaptive Planning (generic).
Communicate Powerfully
A team needs to have effective means of communicating, both amongst team members and also to stakeholders. To Communicate Powerfully, a team needs to prefer in-person communication over distributed communication. Synchronous over asynchronous communication. High-bandwidth over low-bandwidth communication. Multi-mode communication over single-mode communication.
The results of failing to communicate powerfully include wasted time for waiting, misunderstandings leading to defects or re-work, slower development of trust, slower team-building, and ultimately a failure to align perceptions of reality.
The single most effective means to communicate powerfully, is to put all the team in a room together where they can do their work, every day for the majority of the work time.
Some types of work do not lend themselves to this approach (e.g. creating a documentary video), but every effort should be made to improve communication.
Also Known As: Visibility (Scrum), Whole Team and Team Room (Extreme Programming), War Room (business management).
Test Everything
Defects are one of the most critical types of waste to eliminate from a work process. By testing everything, by driving all the work of a team by creating test cases to check the work, a team can reach extremely high quality levels. This ability to prevent defects is so important that only an executive level decision should be considered sufficient to allow defects into a work process. Quality is not negotiable.
In Agile Work, removing a defect is the only type of work that takes priority over any new features/functionality/production. If the end result desired is to maximize value, then removing defects is an important means to that end.
A team has an ethical duty to discover new ways to effectively test their work. This can be through the use of tools, various feedback mechanisms, automation, and good old problem-solving abilities.
Also Known As: Canary in the Coal Mine (Scrum), Test-Driven Development (Extreme Programming), Defects per Opportunities (Six-Sigma).
Measure Value
Since Reality is Perceived, it is important for an agile team and organization to have a clear method of describing and perceiving what is important for the organization. Measuring value is a critical method for describing and perceiving what is important.
A single metric can be used to drive all the measurement and goal-setting and rewards in an organization. All other measurements are secondary and must be treated as such: limited in use and temporary.
There are many things which are easier to measure than value. It is often easy to measure cost, or hours worked, or defects found, or estimate vs. actual... etc. However, all of these other measurements either implicitly or explicitly drive sub-optimal behavior.
Also Known As: Measuring Results (Scrum), ROI (business management), Economic Driver (Good to Great), Running Tested Features (Extreme Programming).
Clear the Path
Everyone in an organization using Agile Work takes responsibility for clearing the path, removing the obstacles that prevent work from being done effectively. Clearing the Path doesn't just mean expedient, quick fixes to problems, but rather taking the time to look at an obstacle and do the best possible to remove it permanently so that it never blocks the path again.
In the Agile Work method, the Process Facilitator is the person who is responsible for tracking obstacles and ensuring that the path is cleared. To do this, the Process Facilitator maintains a Record of Obstacles.
Clearing the Path is sometimes painful work that exposes things we would rather not deal with. As a result, it is critical that people build their capacity for truthfulness and work to develop trust amongst each other. Building a capacity for truthfulness is not something that can be done by using an explicit process.
Also Known As: Removing Obstacles (Scrum), Stopping the Line (Lean).
Remember also, that these practices must always be viewed and implemented in the context of the Agile Axioms. These axioms provide a check to ensure that the practices are not being applied blindly, but rather applied appropriately to the given situation.
Posted by Mishkin Berteig at 09:09 AM | |
June 13, 2006
Fantasy Estimation
In software development (and in many other types of projects), there is a typical non-agile approach to estimation of project size. This method starts with a high-level understanding of the work to be done, the requirements, and uses that to make an initial estimate of the project size. This estimate is often stated in units such as man-months. There is a very important piece missing here that makes this estimate completely useless... that makes it pure fantasy.
The Team
Any estimate made by anyone other than the team doing the work is useless. For any sort of project, software or otherwise, estimates made by a project manager or leader on behalf of an existing, or, even worse, a non-existant team, must be subject to the highest degree of scepticism.
Team Maturity
Not only does the team need to make the estimates for its own work, but the team must be mature! If the team is newly-formed, the team members will have no sense of the team's capacity other than their own individual capacity.
Work History
Not only must the team be mature to make reasonable estimates, it must have a recorded history of their own work capacity in order to be able to estimate their capacity to do work in the future. If there is no record of their capacity, then the usual factors of optimism will be unaccounted for, and the team will almost always over-estimate its capacity.
Knowledge of Domain and Tools
Not only must the team use a recorded measure of their capacity, but they also must be experienced with and knowledgeable of both the subject of the work and the tools they will do to perform the work in order to come up with a reasonable estimate of a project's size. If they need to learn about the project and how to execute it, then again, the team will almost always over-estimate its capacity.
Fantasy
If someone gives you an estimate for project duration, ask them the following questions:
1. Was this estimate made by the team which will actually be doing the work?
2. How long has this team worked together?
3. Has this team measured their own actual capacity and used that measurement for this estimate?
4. How well does the team know the domain and tools to be used?
If the answers to these questions are unsatisfactory, then the estimate is pure fantasy, it is a lie.
Posted by Mishkin Berteig at 09:06 AM | |
June 06, 2006
Agile Work Artifacts - the Work Queue
Agile Work requires only a very small number of simple "artifacts". The most basic is the Work Queue. This is very similar to the Scrum Product Backlog but there are some differences too. The Work Queue is like a carefully managed To-Do list. This article details the use of the Work Queue.
Basic Description
The Work Queue is a list of work to be done by a person, team, organization or community. The list consists of brief descriptions of what to deliver, not how to do it. The list is prioritized so that the item on the top of the list is the single most important thing to get done, with items below that being successively lower priority. All items on the Work Queue contribute directly to an overall goal. The person holding the Product Owner role manages the list.
Place in the Process
The place of the Work Queue in the process is very simple. The Work Queue is initially created after the overall goal is determined. Ideally, it is created before work towards the goal is started, but often Agile Work will be adopted for an ongoing effort, in which case work has already started. The Work Queue is constantly maintained by the Queue Master so that it maintains the above mentioned qualities. One or more of the items from the top of the Work Queue are selected to be worked on. As an item on the list is completed, it is removed from the Work Queue. The number of items on the list that are being worked on simultaneously will depend on the capacity of the people doing the work. If iterations are being used to plan work, then the Work Queue is updated every iteration.
How is it Created/Managed
The Product Owner is responsible for creating and managing the Work Queue.
The initial creation of this Work Queue is a simple process: based on the goals to be attained, and based on an other factors that are relevent, the Product Owner drafts an initial version of the Work Queue. The time spent on creating this initial version should be minimized using three techniques:
1. Keep the Work Queue small by recording only high priority items that need to be done immediately. Don't add items that are uncertain or will be done far in the future. (See "The Horizon of Predictability" for more information about this.)
2. Keep the Work Queue simple by focusing on point-form high-level descriptions of the items in the list. Don't worry about any details about how the item will be accomplished, who will do it, when it will be done, dependencies with other items, or technical or conditional details.
3. In advance, allocate a fixed amount of time to draft the Work Queue... and don't spend any more time on it than that. Get the assistance of the Process Facilitator to keep on track. The list doesn't have to be perfect or complete... you only need enough on the list to allow the work to start.
Ongoing management of the Work Queue consists of removing completed items or items that are no longer needed, adding new items as they are discovered, merging or splitting items as more is learned about them, and reprioritizing items. All of these tasks can be performed at any time. As well, the Work Queue should always be in a state of readiness such that the top items are ready to be selected for work.
The Product Owner is responsible for answering any questions that may arise about the work as it is progressing. If someone doesn't know what is meant by an item, then work on that item should halt until the Product Owner can clarify.
At no time is the Work Queue "frozen" or finalized. It is changing throughout the entire time that people are working towards the goal. Items that are completed are removed from the list, and do not need to be archived or recorded anywhere else, nor is it necessary to save versions of the list as it is changed.
Gating/Queuing
The Work Queue is a queue of work in process (WIP) that is built up in front of the people who are doing the work. As such, it is advisable to keep the list short. The Product Owner acts as a gate to the list: only those things that reasonably contribute to the goal and which are relatively immanent in implementation should be added to the Work Queue. If someone suggests something be added to the Work Queue, the Product Owner must, of course, take that under advisement and collaborate with the suggestor, but is not obligated to add the suggestion to the list.
The Product Owner can manage the size of the Work Queue by deciding how many iterations of future work are allowed on it. In other words, the number of items on the Work Queue is limited to how many can be accomplished in a fixed number of iterations. As the Team takes a number of items off the Work Queue, space is freed to add an equivalent amount of work back onto the Work Queue. The specific number of iterations chosen for this will vary depending on your circumstances.
Differences from the Scrum Product Backlog
The Work Queue does not require two things that are part of the Scrum Product Backlog: item estimates and item values. Adding this information to the Work Queue can be useful in many situations, but is not an essential part of the list.
As well, the management of the Work Queue is different from the Scrum Product Backlog in that the Product Owner is not obligated to put every suggestion that comes their way onto the list.
Advanced Use of the Work Queue
Consider adding the following information to each item on the list:
1. An estimate of effort. Make sure that these estimates are created by the whole group of people who will be doing the work.
2. An estimate of value. The Product Owner needs to be responsible for determining value, but the whole group of people doing the work and all the other stakeholders need to understand how that value was determined.
3. Cycle time tracking. When an item is added to the list, record the date/time it is added, then record the the date/time it is completed and removed from the list. The use of cycle time can assist in making a work process more efficient.
Posted by Mishkin Berteig at 04:24 PM | |
April 12, 2006
Follow the Principles and Adjust the Practices
In "Built to Last : Successful Habits of Visionary Companies" Jim Collins repeatedly emphasizes that long-lasting successful companies have a very single-minded focus. But that focus is not stupid or blind. Rather, Collins uses the phrase "Preserve the core / stimulate progress". This is also the essense of agility.
Follow the Principles
What exactly are the principles? The foundation starts with Trust and Truthfulness. "Truthfulness is the foundation of all human virtues." Everything we do with agile should be about truthfulness (visibility, transparency) and building trust.
With this as a strong foundation, we can look at the Agile Axioms:
We are Creators
Reality is Perceived
Change is Natural
All of the other principles and practices associated with Agile Work flow from these basic assumptions about the world. We can't prove that the above three axioms are "true". But they either resonate with us or they don't. If they do, then it will be easy to use these axioms as a checkpoint for all the activities we engage in using Agile Work, wherever we apply it.
We are creators... therefore we derive our sense of value from our ability to create. If our creations are accepted by others, our team, our stakeholders or our community, all the better. But fundamentally, this is inherent to us as human beings. However, sometimes this natural drive is suppressed or repressed. In order to activate it, we need to work in empowered teams.
Have you ever experienced inspiration or "flow" or joy when working with someone else? Perhaps you were solving a problem. Perhaps you were playing a musical instrument - jamming - and got into a fertile groove. Perhaps you were teaching your children and created the light of understanding in them. Perhaps you built a beautiful set of bookshelves for your home. Or maybe you told a joke that created a brief moment of genuine levity in a group of friends. We are all constantly creating!
This basic principle then means that Agile Work methods and practices should not be imposed. Taught to us, perhaps... given to us as a template, perhaps... but once we understand the practices and are familiar with them, we should immediately be given the freedom to use the learning cycle to be creative with the process and practices of Agile Work itself. If we do not participate in creation, we become dis-empowered and that eventually leads to resentment or apathy.

Reality is perceived... therefore we need to work hard to build a common perception of reality if we are to work together effectively. We need to amplify our learning. We can't assume that our own understanding of a situation is going to be shared by others. At the very least we need to check: "do you see this?"
Let's recognize that in some way or another we are all blind:

Again, the learning cycle comes into play. The guidance, detachment, love, courage and search we go through all help us to build a common understanding of reality. This allows us to see new ways to apply the Agile Work principles and practices that make sense not only to our context, but also to everyone else participating in the work.
Change is natural... therefore instead of fighting change, we need to anticipate it, adjust to it, embrace it, and be gracious or even enthusiastic. Not only does change happen to us, but we also instigate change. If things get to boring, whatever the circumstance, we find ways to change things. We rebel at stasis and ennui.
Each practice and procedure done in the context of Agile Work must be explicity and implicitly accomodating of change. If a procedure can't tolerate change it will either lead to a dissonance or conflict... or if we are embracing change, then we will modify or discard the procedure. Our creative nature loves to create, but if we become too attached, too "in love" with our creations, we will support them past their point of relevance.
Our latest greatest idea will be good for a while. But eventually change will make it irrelevent.
So we see that all three Agile Axioms are also interrelated.
Our creations will be washed away through change and if we are lucky or wise we will perceive the change in reality - be truthful to ourselves and others - and allow a new creation to take the place of the old one.
When we perceive a certain truth, and try to share that with others, we will be asking those others to change their own perceptions. This change can be difficult and may even require the destruction of a mental model created with love and care over a lifetime. Sensitivity to this loss and encouragement to build a new creation will help build a shared perception... as long as we too are open to new perceptions!
Adjust the Practices
And of course, all this foundation of creation, perception and change must be connected to the practical day-to-day reality of our lives. Our family lives, our work lives, our social lives, our volunteer lives, our intellectual lives, our emotional lives, our spiritual lives... our whole lives.
The Agile Work practices are simple to state:
Manage Ourselves
Deliver Frequently
Adapt our Plans
Communicate Powerfully
Test Everything
Measure Value
Remove Obstacles
These practices provide a starting point. A basic set of activities that will assist you, your team or your organization to advance quickly towards whatever goal you have set for yourselves. The way these practices succeed is by making sure that the Agile Axioms are always remembered and their implications accepted. These practices will set up a virtuous circle by building trust and allowing truthfulness. More trust and truthfulness will allow a fuller and more nuanced expression of the practices...
But if these practices become canonized, if they become a rote process imposed and followed blindly, then it means that we have lost sight of the Axioms. We have forgotten to check our practices against the context of creation, perception and change.
The reason we follow these practices is because we believe that we are all creators, that we can learn from our diverse perception of reality and that change is a force of growth. We don't believe these Axioms because we blindly perform these practices.
This is all available as a nicely formatted pdf: Agile Axioms - a Brief Exposition.
Posted by Mishkin Berteig at 01:45 AM | |
March 31, 2006
How the Process Facilitator can Help the Team Handle Out-of-Scope Work Requests
Sometimes an agile team is innundated (or maybe just slightly distracted) by requests for individuals on the team to do work for people or groups outside the team's official stakeholders. This can happen, for example, in a corporate culture that promotes the exchange of favors. This past weekend at our Agile Coach's gathering, Deborah Hartmann shared her method of detecting, exposing and discouraging this unofficial work.
The mechanism is actually very simple: track the work in the team space using cards and a variation on the burndown chart.
The Cards:
During the team's status meeting, or any other time that a team member mentions doing some of this outside work, immediately request that that person write it down on a task card. The task card should be visibly distinct from normal task cards: either a different color or a different size or in a substantially different location. The task should also get an estimate in the same units you are using for the other tasks.
For each task identified, contact the person who requested the extra work. If the person who is doing the work has made a committment to the requestor then let the requestor know that the team has accepted the work but that there is a consequence: the team may not get all its other work done on time. As well, the requester should be informed that in the future, all extra work for individuals on the team must be prioritized by the team's product owner.
Encourage the team to reveal this work by mentioning it at the start of the status meeting, in any iteration planning or retrospective meetings, or in any one-on-one meetings you have with team members.
The Burndown Chart:
Now that all the extra work is reflected in cards with estimates, the burndown chart can track this work too. The key difference is that it is tracked as a separate part of the work. If there are 80 units of normal work remaining, and 20 units of this extra work remaining, then the burndown chart will have a mark at 20 and a mark at 100. The mark at 20 should be made in a different color (I recommend red) so that it is highly visible. One ends up with a burndown chart that looks something like this:

The Product Owner:
It doesn't take much more than a single iteration for the Product Owner to get the message loud and clear: this extra work is eating up the team's capacity! The Product Owner now sees the consequences of not being the go-to person for all work items.
Deb's experience with this was that by the next iteration there were no further requests of the team for unofficial work, and the team's capacity to do work for the Product Owner took a nice leap upwards.
Posted by Mishkin Berteig at 11:26 AM | |
March 23, 2006
Paper on Agile and Metrics
Deborah Hartmann and Robin Dymond have written an excellent paper "Appropriate Agile Measurement: Using Metrics and Diagnostics to Deliver Business Value" [pdf]. I strongly recommend this as critical reading for any organization adopting Agile Work methods. The paper provides a basic framework for the safe use of appropriate metrics: metrics that will help the health of the organization, not hinder it.
Posted by Mishkin Berteig at 11:33 AM | |
March 12, 2006
Work Item Backlogs as Queues - Agile vs. Lean
A recent discussion on the Scrum Development list (Start of Discussion) provides a good follow up to my parting words in The Art of Obstacle Removal about agile practices themselves becoming obstacles. I have excerpted a small amount of the discussion and added my own comments here.
In the agile community, most of us have bought into and adopted the Agile mental model. But that mental model has assumptions embedded into that may not be correct under all circumstances. Part of that mental model includes the efficacy of the work item backlog as a tool for tracking, prioritizing and communicating work to be done in the future.
I will be the first to say that Agile is far better than waterfall in almost every situation (the exception being the mythical project with stable requirements, business environment, technology and team).
That said, let's look at backlogs from another perspective: if a backlog was the only thing you delivered to the customer, would they pay for it? If you spent even just a few hours coaching a business representative to build a backlog, but there was no team to implment it, would that person really find value in the backlog itself? Would they be able to deliver ROI just from a backlog? I think the answer is a clear "no".
That set of questions may seem silly, but from a lean perspective, they are among the most important questions. Is an artifact/process value-added or non-value-added?
Since the backlog is clearly not a value added artifact/process (pause for effect)... it is waste!
When one is doing agile effectively, the backlog may in fact be one of the larger sources of waste! If the team has a stable velocity, there will come a point when the backlog becomes the constraint on the overall cycle time going from idea to ROI. If the backlog is large/long, and as Mary Poppendieck said if there is more than ...maybe two or three
sprints of work.... in there, then it may be time to find ways of constraining the size of the backlog. I have two suggestions:
Capacity of Team(s):
Find a way to increase the capacity of the team so that the backlog size reduces and then goes into a steady state. This may mean augmenting the staff.
Gate Backlog Items by ROI
(This is just theory to me at this point.) Make it a condition that all backlog items must have a positive ROI. In other words, the cost of building the backlog item needs to be less than the value delivered, taking into account time value of money. Don't let items onto the backlog unless this positive ROI can be demonstrated.
I believe the lack of this second discipline (assigning ROI to work items) is one of the main reasons that most agile methods such as Scrum allow an unlimited backlog size: there is no realistic way to gate the work that gets onto the backlog!
Until teams get to Agile nirvana (stable velocity, continuous delivery of business value, high-performance cohesive teams), having an unlimited backlog seems like a very reasonable thing: it's not the constraint or the primary source of waste. However, eventually the backlog will become a primary source of waste and it needs to be treated in a disciplined manner.
With a stable and well-functioning team, what other ways might there be to reduce the size of the backlog so that cycle time is substantially reduced?
Posted by Mishkin Berteig at 03:31 PM | |
March 02, 2006
Five Signs of Trouble in an Iteration
During the course of an iteration, an agile team is able to track it's own progress through the use of burndown charts. The team and the process facilitator can use the burndown chart to watch for signs of trouble. As a coach, I find the following five burndown shapes are common indicators of trouble.
But let's first show the idealized "normal" burndown. This burndown shape shows that the team is on-track to get to done exactly at the end of the iteration. The work remaining has had a constant slope down through the course of the iteration.

Now the warning signs:
1. Too Much Work
In this burndown, the team sees that it has likely selected too much work for the iteration. The process facilitator and the product owner need to work with the team to decide how to change the scope so that the team can get done. One might be tempted to add people to the team to get the work done faster, but this is rarely successful.

2. Not Getting Done
Frequently, when a team is just starting out with agile work, it commits to slightly too much work. It is hard to detect this at the beginning of an iteration. Instead, it is only near the end of the iteration that it becomes apparent that the team isn't quite going to make it to done. The process facilitator must work with the team to determine the root causes of this and change things so it doesn't happen again.

3. Early Learning
When a team is starting the iteration, it can discover new things about the work it has committed to accomplishing. This can include dependencies, new tasks, extra components that need to be built, etc. This discovery process is normal, but needs to be monitored closely. If the burndown doesn't start going down again after about 15% of the iteration is over, then there is likely trouble brewing.

4. Unresolved Obstacles
Sometimes the team will run into an obstacle that will completely stop their progress. Although the process facilitator is responsible for dealing with obstacles, it may be impossible for an obstacle to be fixed quickly. If the team finds that all the work it committed to for the iteration is dependent on someone who is sick or on vacation, that can lead to an unresolvable dead halt. This may be an opportunity to cancel the iteration.
One interesting example of this was observed by a coach I work with frequently, Deborah Hartmann. She was away from her team for a few days and when she came back, she observed this "flatline" burndown. After poking around a little bit to try and find the obstacle, someone finally described what had happened. At the time of the flatline, a Vice President in the organization had come into the team's area, looked around, and loudly declared something to the effect of, "I don't know why you guys are doing this project. It's totally worthless!" Suffice it to say that the team was seriously demoralized. It wasn't a technical obstacle, it wasn't a procedural or bureaucratic obstacle, it wasn't even a cultural obstacle. It was just a serious blow to morale. Of course, to fix this, the actual sponsor of the project had to be brought in to assure the team that it was actually an important project and that there were people in the organization who needed the work that the team was doing.

5. Scope Creep
This last case is rarer for an agile team if the team and the product owner have been educated well about the rules. Nevertheless, it can happen. The product owner, or some other stakeholder, pushes the team to add scope to the iteration. The process facilitator is normally responsible for preventing this from happening. If despite this it does happen, the burndown chart makes the consequences of this scope creep.

Special Quiz Section!!!
What are the possible explanations for the following burndown shape? I have heard/experienced at least six different possible reasons. Leave your answers in the comments.

Update: at Agile Chronicles, there is a short article about this topic which mentions one more burndown chart pattern that is a bad sign: the "Late-Breaking Decline".
Posted by Mishkin Berteig at 01:34 PM | |
December 16, 2005
Two Motivational Metrics for Agile Teams
In general, an organization should have one metric that is used to measure success. However, along the way, it may be useful to temporarily use other metrics to help motivate, track, or predict work. Here are two metrics that can be used in this temporary manner for Agile Work.
Time to Obstacle Removal
TTOR = sum of calendar time elapsed for all unresolved obstacles divided by number of unresolved obstacles
Why Use TTOR: the team, process owner and product owner need to work hard to remove obstacles quickly. This metric tracks how well this is going.
When Use TTOR: use this only when people and the organization are not driven to remove obstacles. This metric can be tied to bonuses and/or compensation in order to give it teeth. Do not measure individuals with this metric. It is only applicable at the team level or higher (e.g. program or division level).
When to Stop Using TTOR: When TTOR has been reduced to less than the time between status meetings (usually one day), then the organization is doing well and this metric should be discontinued.
Obstacles Removed per Iteration
OR/I = number of obstacles closed as removed (not ignored or deferred) in a single iteration
Why Use OR/I: this is a "game" metric or score that encourages large numbers of obstacles to be identified and removed. The more obstacles removed in an organization or team context, the faster the work can be done.
When Use OR/I: if a team is not identifying obstacles in the status meetings, consider implementing this metric to encourage obstacle identification... and critically... resolution. This metric is for team use only.
When to Stop Using OR/I: this metric stops being useful if team members are spending time concocting obstacles that are trivial or worse, deliberately creating obstacles to be resolved. The Process Facilitator needs to be sensitive to these potential pitfalls of this metric. Once the team is consistently identifying one or two obstacles per status meeting, and they are getting resolved in equal quantity, this metric must be discontinued.
A Word of Caution: there is no substitute for a . These two metrics are contextual and temporary. Do not use them if they are not indicated by the circumstances and be sure to discontinue use when symptoms disappear.
Posted by Mishkin Berteig at 11:57 PM | |
November 16, 2005
A Metric Leading to Success
I just recently read the article by Ron Jeffries: A Metric Leading to Agility. It's a good, well written, well thought out article. If you are in the software business, check it out if you haven't already.
However, much as it is good advice, I believe that I must add a cautionary note.
Why Agility?
The title of the above article, and the metric suggested (Running Tested Features), imply some pretty serious questions: why agility? Aren't we really trying to help organizations succeed? Isn't agility just a means?
I've seen organizations adopt Agile in some form or another for lots of different reasons. The best reason is because it is recognized as a means to succeed. However, as a means, you don't want Agile to drive change in your organization. Something else should be doing that. Some need, some failing, some gap or some pain. And that need should be measured.
Appropriate Metrics
Running Tested Features as a metric is indeed powerful: it is difficult to "game" and it seems to promote the delivery of features, which presumably are valuable. The problem comes with the presumption of value. What if you end up choosing the wrong features? What if you are using agile on a non-new-product, non-software project? What if you don't care what method you use, but you want a metric that will drive success (and might as a by-product encourage Agile approaches)?
One great approach to Metrics comes from the book "Good to Great" by Jim Collins. The research team for the book discovered that every organization (in their sample) that made a sustainable change from mediocre to great results had a central, single metric (among other things) that was used as an economic driver to guide and measure the transformation. I enquired of the author about this: did the research team discover the use of more than one metric? Joanne Ernst on the research team responded:
I discussed your email with Jim, and he says that all of the metrics/measures that were consistently shared by GTG companies were reported in the book – e.g., the economic driver. (Personal Communication, 26 Jun 2005)
When looking at an organizational level, suddenly Running Tested Features seems like it might be a little beside the point. Mary and Tom Poppendieck in "Lean Software Development" discuss using financial models to help drive a team's work to become more Lean, more Agile... and specifically to be aligned with what is going to bring success to the organization.
Using metrics to drive behavior or performance is tricky business. Simpler is better, fewer is better and directly related to overall organizational goals is better. Measuring Running Tested Features can indeed drive a team to become more agile, but that might not be the best thing for the organization, or it may not be applicable to the organization. There is no One True Metric. Each organization and team has to find out what works best based on application of principles and experimentation.
One metric that leads to agile? Maybe. One metric that leads to success? That's what your organization needs to find for itself.
See also: Appropriate Metrics, The One True Metric.
Posted by Mishkin Berteig at 07:15 AM | |
September 26, 2005
Wideband Delphi Estimation Technique
Here's an excellent introductory article on the wideband delphi estimation technique. Typically wideband delphi is used to estimate software development efforts, but can be used in almost any domain of work. This method might be applied to estimating effort for items in a work list at either a project level or tasks in an iteration work list. The way it is described, it sounds fairly heavy-weight, potentially taking several hours for a relatively small list of work items. However, it is worthwhile for process facilitators and product owners to be aware of these sorts of methods if problems with estimating occur in a project team. The wideband delphi model is related to the Delphi method.
[Update 2007/05/24]
Agile Work and Scrum use a very different method of estimating work that has one very important and incredible property: people don't have to get better at estimating for them to get better at committing to work!
The basic idea can be thought of as "commitment velocity". The method here is to use an arbitrary unit of effort that the team applies to estimating all tasks relative to each other. At the start of an iteration, the team can use any collaborative method (including wideband delphi) to come up with estimates for tasks. The team sums up the estimates for all the work of the iteration. Then, at the end of the iteration the team looks at the estimates for all the remaining undone work (if any) and subtracts that from the start of iteration sum. This is the Commitment Velocity. Now on their next iteration, they do their estimation work again, relative to the tasks in the previous iteration. If the sum of the estimates is larger than the Commitment Velocity, then the team needs to de-scope or find more efficient solutions to their work. This process usually converges after only three iterations (assuming: constant team composition, constant iteration length).
This method is taught in detail in my Agile Project Management courses, and there is a little bit more information here: Planning vs. Commitment. The agile estimation method of Commitment Velocity is an application of the Central Limit Theorem from statistics.
[Update: 2007/09/11]
Wikipedia now has an article on Wideband Delphi. The article points out some interesting potential problems with the wideband delphi method including corruption of the group doing the estimation and suppression of minority opinions. I know that in my experience as a coach, I have seen numerous occasions of both types of problem with estimation processes. The fact that wideband delphi is susceptible to these problems is more a factor of the human side of things than the method itself.
Interestingly, the wideband delphi method of estimation is very similar to the "Planning Poker" method of estimation used in many agile and scrum project environments. This method is also covered in the Agile Project Management courses.
Other links to wideband delphi:
Wideband Delphi Estimation Process
The ProjectInitiation.com website has a wideband delphi worksheet (MS Word) available.
Project Estimation: Wideband Delphi
Posted by Mishkin Berteig at 12:40 AM | |
May 12, 2005
Appropriate Metrics - Continued
Lean Metrics... are Lean
In the book Lean Software Development by Mary and Tom Poppendieck, there are a small number of references to metrics: process cycle time, process cycle efficiency, business models. Lean practices focus very much on diagnostic metrics that are used to help people find and eliminate waste and improve value and quality. The other aspect of metrics is to measure up for purposes of motivation and performance measurement.
Conclusions for Scrum and Agile in General
Don't prescribe specific metrics!
Agile work is about an empirical process where a team responds to change, learns, and self-regulates. An agile team has the power to choose their own metrics for their own self-inspection. For upper management, the single economic driver that is part of the "Good to Great" process should be sufficient.
See also: Appropriate Metrics and A Metric Leading to Success.
Posted by Mishkin Berteig at 07:14 PM | |
May 11, 2005
Appropriate Metrics
At the Advanced ScrumMaster Training, Ken Schwaber presented a substantial amount of thinking about metrics used with Scrum. The main driver for thinking about metrics has come from implementing Scrum in enterprise situations. Management expects metrics to be used in order to provide visibility into the progress of the Scrum implementation.
While this driver has some legitimacy, there are three main concerns to prescribing metrics for use with Scrum.
1. Planned/Engineering Approach - metrics such as "ideal person days" smell like the bad old way of treating people as resources that can be swapped in and out of a project.
2. Normative vs. Empirical - metrics are often used to set a standard for reasons such as prediction, and expectation. Scrum is about discovery and improvement not prediction and planning.
3. Is Something in Scrum not Working? Is adoption being hindered? Are too many Scrum implementations failing? Are metrics a critical success factor?
Keep these concerns in mind while considerig the uses of metrics.
What are Metrics for?
1. Self-Evaluation over Time - use a metric to track the progress of a group. A measurement is taken at a certain point in time, and then taken repeatedly over intervals. Example: the velocity at which a team completes work can be used to identify problems and opportunities for a team.
2. Control - use a metric to legislate the qualities of some process or attribute of work. A goal or standard is set for a measurement. The size of a queue of projects waiting to be worked upon by a team can be controlled in order to limit the size of work in progress and therefore project inventory.
3. Prediction - use a metric with values collected over time in order to predict future values of that metric. By implication, the metric is used to predict the performance of a system. The number of additional tasks discovered inside an iteration can be tracked and used to determine future expectations on extra tasks discovered.
4. Performance Measurement - use a metric in order to determine rewards and/or punishments and/or adjustments to behavior. An individual on a team may be evaluated based on their productivity as measured by lines of code completed and rewarded or penalized on that basis (not recommended!).
5. Behavior Motivation - use a metric to guide behavior by setting a context for thinking, action and reflection. Focus on an important measure in order to draw attention to improving the attribute with which the metric is associated. Measuring the time elapsed from conception of a project idea to the time it actually delivers valuable results can draw attention to improving speed.
The Lesson from Good to Great
Good to Great: Why Some Companies Make the Leap... and Others Don't by Jim Collins discusses the attributes and behavior that are common and unique to companies that have gone from a long history of mediocre results to a long run of great results. One identified aspect is referred to as the "Hedgehog Principle". In this principle, three questions are answered: "what can we be the best in the world at?", "what can we be passionate about?", "what is my one economic driver?"
The economic driver is a metric. For example, at Walgreens, their driver is profit per customer visit. Other large institutions have other metrics. But all good to great companies have a single economic driver metric that guides all their decision making.
See also: A Metric Leading to Success.
Posted by Mishkin Berteig at 05:21 PM | |
April 20, 2005
Scrum Scorecards - Measurements to See Progress of Agile Adoption
Two interesting visual presentations of the progress of adoption of Scrum practices. These are marginally software-specific but could very easily be adapted to non-software agile work situations.
http://wiki.scrums.org/index.cgi?ScrumScoreboard
Posted by Mishkin Berteig at 04:31 PM | |
April 18, 2005
Book Review: "Good to Great" by Jim Collins
Summary: In this well-written, engaging book, author Jim Collins describes six critical factors that he and his research team found common in companies that transformed themselves from a long period of mediocre or bad results to a long period of great financial results. Although focused on publicly-traded companies in the United States, the results of this research can easily be extended to apply to other types of organizations.
Good to Great describes the following six concepts:
- Level 5 Leadership: personal humilty and professional discipline in an organization's leader are the starting point for the transformation.
- First Who... Then What: don't worry about what to do until the right people are in the right positions in an organization.
- Confront the Brutal Facts (Yet Never Lose Faith): careful and honest examination of an organization's current situation is the foundation for finding a path forward.
- The Hedgehog Concept (Simplicity within the Three Circles): discover a simple business concept that people can be passionate about, that works with a single key economic driver and that the organization can be the best in the world.
- A Culture of Discipline: disciplined people removes the need for heirarchy, disciplined thought removes the need for bureaucracy and disciplined action removes the need for excessive controls.
- Technology Accelerators: pioneer the application of carefully selected technologies without relying on technology for transformation.
Some of these concepts are very close to the underlying prinicples of agile work. For example, in the Scrum methodology, the first five principles are all represented. The Scrum Master embodies some of the attributes of level 5 leadership. A self-organizing team gets the right people in the right position. The daily scrum and the sprint planning meetings are designed to help the team confront the brutal facts. The sprint goal embodies at a local level the simplicity of the hedgehog concept. And the practices in general are a manifestation of a culture of discipline.
Who Should Read this Book? Anyone interested in creating a lasting positive transformation in an organization should read this book. In particular, individuals who are coaching teams or organizations should read this book since the concepts also appear to apply at a sub-organizational level.
Posted by Mishkin Berteig at 07:29 PM | |