Pitfall of Scrum: Excessive Preparation/Planning

Regular big up-front planning is not necessary with Scrum. Instead, a team can just get started and use constant feedback in the Sprint Review to adjust it’s plans. Even the Product Backlog can be created after the first Sprint has started. All that is really necessary to get started is a Scrum Team, a product vision, and a decision on Sprint length. In this extreme case, the Scrum Team itself would decide what to build in its first Sprint and use the time of the Sprint to also prepare some initial Product Backlog Items. Then, the first Sprint Review would allow stakeholders to provide feedback and further develop the Product Backlog. The empirical nature of Scrum could even allow the Product Owner to emerge from the business stakeholders, rather than being assigned to the team right from the start.

Starting a Sprint without a Product Backlog is not easy, but it can be done. The team has to know at least a little about the business, and there should be some (possibly informal) project or product charter that they are aware of. The team uses this super basic information and decides on their own what to build in their first Sprint. Again, the focus should be on getting something that can be demoed (and potentially shippable). The team is likely to build some good stuff and some things that are completely wrong… but the point is to get the Inspect and Adapt cycle started as quickly as possible. Which means of course that they need to have stakeholders (customers, users) actually attend the demo at the end of the Sprint. The Product Owner may or may not even be involved in this first Sprint.

One important reason this is sometimes a good approach is the culture of “analysis paralysis” that exists in some organizations. In this situation, an organization is unable to do anything because they are so concerned about getting things right. Scrum is a framework for inspect and adapt and that can (and does) include the Product Backlog. Is it better for a team to sit idle while someone tries to do sufficient preparation? Or is it better to get started and inspect and adapt? This is actually a philosophical question (as well as a practical question). The mindset and philosophy of the Agile Manifesto and Scrum is that trying to produce valuable software is more important that documentation… that individuals and how they work together is more important than rigidly following a process or tool. I will agree that in many cases it is acceptable to do some up-front work, but it should be minimized, particularly when it is preventing people from starting to deliver value. The case of a team getting started without a product backlog is rare… but it can be a great way for a team to help an organization overcome analysis paralysis.

The Agile Manifesto is very clear: “The BEST architectures, requirements and designs emerge out of self-organizing teams.” [Emphasis added.]

Hugely memorable for me is the story that Ken Schwaber told in the CSM course that I took from him in 2003.  This is a paraphrase of that story:

I [Ken Schwaber] was talking to the CIO of a large IT organization.  The CIO told me that his projects last twelve to eighteen months and at the end, he doesn’t get what he needs.  I told him, “Scrum can give you what you don’t need in a month.”

I experienced this myself in a profound way just a couple years into my career as an Agile coach and trainer.  I was working with a department of a large technology organization.  They had over one hundred people who had been working on Agile pilot projects.  The department was responsible for a major product and executive management had approved a complete re-write.  The product managers and Product Owners had done a lot of work to prepare a product backlog (about 400 items!) that represented all the existing functionality of the product that needed to be re-written.  But, the big question, “what new technology platform do we use for the re-write?” had not yet been resolved.  The small team of architects were tasked with making this decision.  But they got stuck.  They got stuck for three months.  Finally, the director of the department, who had learned to trust my advice in other circumstances, asked me, “does Scrum have any techniques for making these kind of architectural decisions?”

I said, “yes, but you probably won’t like what Scrum recommends!”

She said, “actually, we’re pretty desperate.  I’ve got over a hundred people effectively sitting idle for the last three months.  What does Scrum recommend?”

“Just start.  Let the teams figure out the platform as they try to implement functionality.”

She thought for a few seconds.  Finally she said, “okay.  Come by this Monday and help me launch our first Sprint.”

The amazing thing was that the teams didn’t lynch me when on Monday she announced that “our Agile consultant says we don’t need to know our platform in order to get started.”

The first Sprint (two weeks long) was pretty chaotic.  But, with some coaching and active support of management, they actually delivered a working increment of their product.  And decided on the platform to use for the rest of the two-year project.

You must trust your team.

If your organization is spending more than a few days preparing for the start of a project, it is probably suffering from this pitfall.  This is the source of great waste and lost opportunity.  Use Scrum to rapidly converge on the correct solutions to your business problems instead of wasting person-years of time on analysis and planning.  We can help with training and coaching to give you the tools to start fast using Scrum and to fix your Scrum implementation.

This article is a follow-up article to the 24 Common Scrum Pitfalls written back in 2011.

[UPDATE: 2015/08/19] I’ve just added a video to the “Myths of Scrum” YouTube series that adds a bit to this:


Affiliated Promotions:

Try our automated online Scrum coach: Scrum Insight - free scores and basic advice, upgrade to get in-depth insight for your team. It takes between 8 and 11 minutes for each team member to fill in the survey, and your results are available immediately. Try it in your next retrospective.

Please share!
Facebooktwittergoogle_plusredditpinterestlinkedinmailFacebooktwittergoogle_plusredditpinterestlinkedinmail

Scrum Data Warehouse Project

May people have concerns about the possibility of using Scrum or other Agile methods on large projects that don’t directly involve software development.  Data warehousing projects are commonly brought up as examples where, just maybe, Scrum wouldn’t work.
I have worked as a coach on a couple of such projects.  Here is a brief description of how it worked (both the good and the bad) on one such project:
The project was a data warehouse migration from Oracle to Teradata.  The organization had about 30 people allocated to the project.  Before adopting Scrum, they had done a bunch of up-front analysis work.  This analysis work resulted in a dependency map among approximately 25,000 tables, views and ETL scripts.  The dependency map was stored in an MS Access DB (!).  When I arrived as the coach, there was an expectation that the work would be done according to dependencies and that the “team” would just follow that sequence.
I learned about this all in the first week as I was doing boot-camp style training on Scrum and Agile with the team and helping them to prepare for their first Sprint.
I decided to challenge the assumption about working based on dependencies.  I spoke with the Product Owner about the possible ways to order the work based on value.  We spoke about a few factors including:
  • retiring Oracle data warehouse licenses / servers,
  • retiring disk space / hardware,
  • and saving CPU time with new hardware
The Product Owner started to work on getting metrics for these three factors.  He was able to find that the data was available through some instrumentation that could be implemented quickly so we did this.  It took about a week to get initial data from the instrumentation.
In the meantime, the Scrum teams (4 of them) started their Sprints working on the basis of the dependency analysis.  I “fought” with them to address the technical challenges of allowing the Product Owner to work on the migration in order based more on value – to break the dependencies with a technical solution.  We discussed the underlying technologies for the ETL which included bash scripts, AbInitio and a few other technologies.  We also worked on problems related to deploying every Sprint including getting approval from the organization’s architectural review board on a Sprint-by-Sprint basis.  We also had the teams moved a few times until an ideal team workspace was found.
After the Product Owner found the data, we sorted (ordered) the MS Access DB by business value.  This involved a fairly simple calculation based primarily on disk space and CPU time associated with each item in the DB.  This database of 25000 items became the Product Backlog.  I started to insist to the teams that they work based on this order, but there was extreme resistance from the technical leads.  This led to a few weeks of arguing around whiteboards about the underlying data warehouse ETL technology.  Fundamentally, I wanted to the teams to treat the data warehouse tables as the PBIs and have both Oracle and Teradata running simultaneously (in production) with updates every Sprint for migrating data between the two platforms.  The Technical team kept insisting this was impossible.  I didn’t believe them.  Frankly, I rarely believe a technical team when they claim “technical dependencies” as a reason for doing things in a particular order.
Finally, after a total of 4 Sprints of 3 weeks each, we finally had a breakthrough.  In a one-on-one meeting, the most senior tech lead admitted to me that what I was arguing was actually possible, but that the technical people didn’t want to do it that way because it would require them to touch many of the ETL scripts multiple times – they wanted to avoid re-work.  I was (internally) furious due to the wasted time, but I controlled my feelings and asked if it would be okay if I brought the Product Owner into the discussion.  The tech lead allowed it and we had the conversation again with the PO present.  The tech lead admitted that breaking the dependencies was possible and explained how it could lead to the teams touching ETL scripts more than once.  The PO basically said: “awesome!  Next Sprint we’re doing tables ordered by business value.”
A couple Sprints later, the first of 5 Oracle licenses was retired, and the 2-year $20M project was a success, with nearly every Sprint going into production and with Oracle and Teradata running simultaneously until the last Oracle license was retired.  Although I don’t remember the financial details anymore, the savings were huge due to the early delivery of value.  The apprentice coach there went on to become a well-known coach at this organization and still is a huge Agile advocate 10 years later!

Affiliated Promotions:

Try our automated online Scrum coach: Scrum Insight - free scores and basic advice, upgrade to get in-depth insight for your team. It takes between 8 and 11 minutes for each team member to fill in the survey, and your results are available immediately. Try it in your next retrospective.

Please share!
Facebooktwittergoogle_plusredditpinterestlinkedinmailFacebooktwittergoogle_plusredditpinterestlinkedinmail

SAFe Program Consultant Training – Review

I want to give some perspective on SAFe and the training that I have been attending these last few days.  The training itself is not actually over, but we are very near the end.  Just one day left, but it is dominated by the SPC exam and open Q&A on advanced topics.  In other words, we have covered the essence of SAFe.

Ad Hoc, Pragmatic and Transformative

When I think about organizations or departments trying to become Agile enterprises, I generally categorize those efforts into three approaches.

The “Ad Hoc” approach is typified by a grassroots movement or an executive decreeing “be Agile” with no one really knowing what that means.  A lot of organizations have some teams in this condition – they try Scrum, try some other Agile-ish things, and have modest successes.  When the enterprise is large enough, these ad hoc approaches reach a natural limit of effectiveness before they become severely blocked by organizational considerations.  Then, the leadership of the organization must turn to systematic approaches to becoming an Agile enterprise: the Pragmatic approaches or the Transformative approaches.

The “Pragmatic” approach acknowledges the difficulty of change, particularly for those in middle management.  There is still a deep acknowledgement of the Agile values and principles, but the pragmatic part is to say that the organization will take quite a long time to adopt those values and principles end-to-end, top-to-bottom.  These pragmatic approaches typically have low risk and good results.  SAFe (Scaled Agile Framework) falls into this category along with DAD (Disciplined Agile Delivery) and possibly others that I’m not aware of.

The “Transformative” approach acknowledges the deep nature of Agile as a cultural transformation that can be done quickly when there is urgency to do so.  There is still an acknowledgement that Agile can be difficult for many people as it requires a change in mindset and deep habitual behaviours.  These approaches are transformative because they require all protagonists in the enterprise to be open to this deep and fast change to a new culture.  LeSS (Large Scale Scrum) and RAP (Real Agility Program) are both systematic transformative frameworks.

SAFe, as a pragmatic approach, has a number of excellent features that will help an organization accomplish its business and technology goals.

Scaled Agile Framework – Practical, Pragmatic, and Still Pure Agile

One big concern I had about SAFe, based on other people’s comments, was that it somehow was compromising the values of the Agile Manifesto.  I want to say clearly and unequivocally that SAFe is most certainly true to Agile.  This fact was demonstrated multiple times and in multiple ways throughout the training:

  • Explicit statements that SAFe is based on the Agile Manifesto.  At one point, Dean Leffingwell emphatically repeated several times that “we live or die by the Agile Manifesto!”
  • Clear examples of SAFe implementations making choices based on the values and principles of the Agile Manifesto.  It was common to talk about situations where SAFe ScrumXP teams, Agile Release Trains and the people involved made decisions based on “individuals and interactions”.
  • Practices and guidelines that implement the values and principles of Agile are pervasive throughout SAFe.  The Inspect and Adapt meeting, Program Increments, daily business collaboration with SAFe ScrumXP teams, customer collaboration through various forms of backlogs, reviews and demos, focus on simplicity and technical excellence with Architectural Runway, Test-Driven Development and other Agile engineering practices.
  • The instructors (not just Mr. Leffingwell) often mentioned their own philosophy of being flexible with the SAFe “framework” by making appropriate context-specific changes to the details.
  • Even participants in the class who have already started using SAFe in their organizations shared stories that clearly indicated a strong emphasis on the values and principles of Agility.

At the same time, SAFe manages to create a relatively simple interface with a traditional management organization.  This is critical and what makes it really effective as a pragmatic approach to enterprise agility.  For example, at the Agile Release Train level, there are nine roles identified (e.g. System Architect, Product Management, Business Owners).  The explicit acknowledgement and identification of these roles and how they interact with the SAFe ScrumXP teams through meetings, artifacts and other processes and tools helps an organization to map Agility at the staff level to traditional concepts at the middle-management level.  This interfacing is also pervasive throughout the SAFe framework and occurs at all levels of effort from individual team members up to high level business leaders.

Some people have grumbled about the complicated diagram as “proof” that SAFe can’t be Agile.  But a different way of looking at the diagram is that it is comfort for management.  I really appreciate this.  Back in 2004 and 2005 when I was consulting at Capital One on their first enterprise attempt at Agile, one of the coaches I was working with shared a story with me about the importance of comfort.  The project manager for an important project was very nervous that there was no Gantt chart in Agile.  At a personal level, she needed the comfort of having a Gantt chart to track the work of the team.  The coach for this project told the project manager “please, make your Gantt chart – just make sure that you let the team organize themselves without being disturbed to help you with the Gantt chart.”  Most Agilists are anti-Gantt.  This was a real eye-opener for me.  That project manager went on to gain confidence in the Agile team and was able to eventually discard the Gantt chart.

SAFe isn’t just a framework, it’s actually a scaffolding.  When you build an arch, you need a scaffold to keep everything in place until the keystone is in place.  In creating an Agile enterprise, you use SAFe as a scaffold to get you to Agility.

Lean, Agile and Leadership

This training has also spent a lot of time discussing Lean thinking, Lean product flow and Lean leadership.  SAFe asserts four principles of Agile Leadership:

  1. Take a systems view
  2. Embrace the Agile Manifesto
  3. Implement product development flow
  4. Unlock the intrinsic motivation of knowledge workers

I like this list.  I might change the wording slightly, but in going through the details of what these mean, it is clear that if leaders could adopt these principles, every organization would be a much better place to work.

There is a fair amount of time spent on helping leaders make the shift in thinking from traditional “scientific management” to “Agile leadership”.  There are a lot of good reading references given in these discussions including “Five Dysfunctions of a Team”.  There is also a lot of time spent on value stream thinking including some great discussion exercises.

Organizational Structure in SAFe

SAFe does not define all the structures throughout the whole organization.  By design, it is not end-to-end, top-to-bottom.  It does define a structure for three levels of activity: the team level, the program level and the portfolio level.

At the team level, SAFe relies on a slightly modified version of Scrum and Extreme Programming (XP) that it calls SAFe ScrumXP.  As a Certified Scrum Trainer, I’m confident that the Scrum described is “good enough” to be legitimate Scrum even if there are small variations.  One example is in the idea of commitment.  Scrum espouses the value of Commitment.  In “old” versions of Scrum, the Scrum Team was required to commit to the work of the Sprint (the business scope).  SAFe keeps this concept.  However, if you look in the most recent version of the Scrum Guide, this concept is no longer present.  One thing that I think is absolutely fantastic is that several of the XP technical practices are required practices in SAFe: Test Driven Development, Continuous Integration, Pair Programming, User Stories, Acceptance Test Automation and Refactoring.  I wish that Scrum would get around to officially requiring these practices.  This set of canned answers is sometimes an irritant for Scrum folks, but the fact is that, again, middle managers are often made more comfortable by being provided with concrete answers.  And, in my not-so-humble opinion, SAFe is providing the right answers.  Since all this is at the Team level, middle managers are even more comfortable because they can tell all these staff-level people how to work.

At the program level, SAFe scales the basic concept of a Sprint up to a larger “Program Increment” (PI) concept.  The core concept that holds the program level together is the Agile Release Train which is based on a limit to the number of people who can work effectively in a social network (Dunbar’s number ? 150).  Again, SAFe is quite definitive about process at this level: Sprints are 2 weeks long and PIs are 5 Sprints long (10 weeks).  Timeboxing is explained effectively with the concepts of cadence and synchronization as a way to ensure predictability at the program level.  Unlike the simplicity of the Team level, the Program level in SAFe introduces a number of important connectors to transitional organizations.  This is done through defining several roles that have extremely close analogues to traditional roles (and even use a lot of the same names), and through other artifacts such as vision, roadmap, non-functional requirements, and features.  There are even a number of recommended metrics for evaluating the performance of the program (not the people).

At the Portfolio level, SAFe simplifies again somewhat in that there are no new aspects of cadence or synchronization introduced, and the number of defined roles and artifacts at this level is relatively small.  One important difference at this level compared to the Program and Team levels is the introduction of a Kanban approach used to feed “Program Epics” to the Agile Release Trains at the Program level.  At this level, Kanban is used to drive the flow of value, but there is not as much emphasis on continuous improvement here (although there is when SAFe discusses leadership).  At all three levels, there is a constant emphasis on the lean concept of focusing on value rather than cost.  This comes in many of the details, but may be a bit difficult for middle managers.  Fortunately, the Portfolio level  includes some excellent advice on working with budgets and allocating those budgets to business vs. technical needs and based on the effort required at the Program level with the Agile Release Trains.  SAFe recommends revisiting budgets every six months (I believe this is meant to be every 2 Product Increments) and is the only aspect of cadence and synchronization at the Portfolio level.

The Training

I’ll admit that overall I didn’t particularly enjoy the training.  I love SAFe.  As a trainer myself, I’m too critical perhaps.  Certainly, the training I deliver has evolved over ten years of work with lots and lots of feedback and mentorship.  However, in the Agile community, the overall standard for training has improved greatly over the last 5 years and I would love to see our three trainers who helped with this course improve their delivery.

There are a also some general comments about the training that I would like to make that are about personal preference.

First, I would prefer more small exercises that are experiential.  For example, there was a great deal of time spent on centralized vs. decentralized decision-making and leadership which could have been compressed greatly with a simple exercise like the “Command and Control Walking Simulation” which takes about 5 minutes to drive home the point unequivocally.  The first two days were largely lecture with a couple big exercises (both the lecture and the big exercises were generally good).

Second, the slides.  The slides.  The slides.  The slides… and more slides!!!  Too much by far.  And using the slides for lecture made it very difficult to stay on track for time with lots of slides missed or touched on only very briefly.  This is anxiety-inducing and boredom-inducing for me.  Some people like lots of slides, but most people don’t.

Third, not enough breaks for a 9 to 6 training session.  Usually just one break in the morning and one in the afternoon as well as a short lunch.  Two breaks and a longer lunch would have made it much more tolerable from a personal comfort level.  At one point on the third day I just had to take an extra break and I ended up missing about 30 minutes before I felt ready to come back.

Final Words

I’m happy I invested in this for both myself and for Travis.  We have learned a lot about SAFe, a little about Agile and Lean, and we are both excited about offering SAFe-related services to some of our clients.  At this point I am convinced that it is appropriate and good under some common (but not universal) conditions.

I will probably write several more articles about SAFe as I process the information and start to relate it to more specific aspects of Agile, Lean, organizations, management, leadership, productivity, and, of course, our own Agile Enterprise framework, the Real Agility Program. I’m excited and happy to see that the two frameworks are not competitive or exclusive in any significant way… more about that of course!


Affiliated Promotions:

Try our automated online Scrum coach: Scrum Insight - free scores and basic advice, upgrade to get in-depth insight for your team. It takes between 8 and 11 minutes for each team member to fill in the survey, and your results are available immediately. Try it in your next retrospective.

Please share!
Facebooktwittergoogle_plusredditpinterestlinkedinmailFacebooktwittergoogle_plusredditpinterestlinkedinmail

Technical Push-Back – When is it Okay? When is it Bad?

Whenever I run a Certified Scrum Product Owner training session, one concept stands out as critical for participants: the relationship of the Product Owner to the technical demands of the work being done by the Scrum team.

The Product Owner is responsible for prioritizing the Product Backlog. This responsibility is, of course, also matched by their authority to do so. When the Product Owner collaborates with the team in the process of prioritization, there may be ways which the team “pushes back”. There are two possible reasons for push-back. One is good, one is bad.

Bad Technical Push-Back

BudapestDSCN3928-smallThe team may look at a product backlog item or a user story and say “O gosh! There’s a lot there to think about! We have to build this fully-architected infrastructure before we can implement that story.” This is old waterfall thinking. It is bad. The team should always be thinking (and doing) YAGNI and KISS. Technical challenges should be solved in the simplest responsible way. Features should be implemented with the simplest technical solution that actually works.

As a Product Owner, one technique that you can use to help teams with this is that when the team asks questions, that you aggressively keep the user story as simple as possible. The questions that are asked may lead to the creation of new stories, or splitting the existing story. Here is an example…

Suppose the story is “As a job seeker I can post my resume to the web site…” If the technical team makes certain assumptions, they may create a complex system that allows resumes to be uploaded in multiple formats with automatic keyword extraction, and even beyond that, they may anticipate that the code needs to be ready for edge cases like WordPerfect format.  The technical team might also assume that the system needs a database schema that includes users, login credentials, one-to-many relationships with resumes, detailed structures about jobs, organizations, positions, dates, educational institutions, etc. The team might insist that creating a login screen in the UI is an essential prerequisite to allowing a user to upload their resume.  And as for business logic, they might decide that in order to implement all this, they need some sort of standard intermediate XML format that all resumes will be translated into so that searching features are easier to implement in the future.

It’s all CRAP, bloat and gold-plating.

Because that’s not what the Product Owner asked for.  The thing that’s really difficult for a team of techies to get with Scrum is that software is to be built incrementally.  The very first feature built is built in the simplest responsible way without assuming anything about future features.  In other words, build it like it is the last feature you will build, not the first.  In the Agile Manifesto this is described as:

Simplicity, the art of maximizing the amount of work not done, is essential.

The second feature the team builds should only add exactly what the Product Owner asks for.  Again, as if it was going to be the last feature built.  Every single feature (User Story / Product Backlog Item) is treated the same way.  Whenever the team starts to anticipate the business in any of these three ways, the team is wrong:

  1. Building a feature because the team thinks the Product Owner will want it.
  2. Building a feature because the Product Owner has put it later on the Product Backlog.
  3. Building a technical aspect of the system to support either of the first types of anticipation, even if the team doesn’t actually build the feature they are anticipating.

Okay, but what about architecture?  Fire your architects.  No kidding.¹

Good Technical Push-Back

Rube Goldberg Self Operating Napkin

Sometimes stuff gets non-simple: complicated, messy, hard to understand, hard to change.  This happens despite us techies all being super-smart.  Sometimes, in order to implement a new feature, we have to clean up what is already there.  The Product Owner might ask the Scrum Team to build this Product Backlog Item next and the team says something like: “yes, but it will take twice as long as we initially estimated, because we have to clean things up.”  This can be greatly disappointing for the Product Owner.  But, this is actually the kind of push-back a Product Owner wants.  Why?  In order to avoid destroying your business!  (Yup, that serious.)

This is called “Refactoring” and it is one of the critical Agile Engineering practices.  Martin Fowler wrote a great book about this about 15 years ago.  Refactoring is, simply, improving the design of your system without changing it’s business behaviour.  A simple example is changing a set of 3 radio buttons in the UI to a drop-down box with 3 options… so that later, the Product Owner can add 27 more options.  Refactoring at the level of code is often described as removing duplication.  But some types of refactoring are large: replacing a relational database with a NoSQL database, moving from Java to Python for a significant component of your system, doing a full UX re-design on your web application.  All of these are changes to the technical attributes of your system that are driven by an immediate need to add a new feature (or feature set) that is not supported by the current technology.

The Product Owner has asked for a new feature, now, and the team has decided that in order to build it, the existing system needs refactoring.  To be clear: the team is not anticipating that the Product Owner wants some feature in the future; it’s the very next feature that the team needs to build.

This all relates to another two principles from the Agile Manifesto:

Continuous attention to technical excellence and good design enhances agility.

and

The best architectures, requirements, and designs emerge from self-organizing teams.

In this case, the responsibilities of the team for technical excellence and creating the best system possible override the short-term (and short-sighted) desire of the business to trade off quality in order to get speed.  That trade-off always bites you in the end!  Why? Because of the cost of fixing quality problems increases exponentially as time passes from when they were introduced.

Young Girl Wiping Face With Napkin

 

 

 

 

 

 

 

Refactoring is not a bad word.

Keep your code clean.

Let your team keep its code clean.

Oh.  And fire your architects.

Update Sep. 8, 2015: Check out this YouTube video on the closely related topic of who has authority over the Product Backlog and why developers should not set the order of PBIs:

¹ I used to be a senior architect reporting directly to the CTO of Charles Schwab.  Effectively, I fired myself and launched an incredibly successful enterprise architecture re-write project… with no up-front architecture plan.  Really… fire your architects.  Everything they do is pure waste and overhead.  Someday I’ll write that article 🙂


Affiliated Promotions:

Try our automated online Scrum coach: Scrum Insight - free scores and basic advice, upgrade to get in-depth insight for your team. It takes between 8 and 11 minutes for each team member to fill in the survey, and your results are available immediately. Try it in your next retrospective.

Please share!
Facebooktwittergoogle_plusredditpinterestlinkedinmailFacebooktwittergoogle_plusredditpinterestlinkedinmail

The Rules of Scrum: I know my product well and can quickly describe its high-level architecture

All Scrum Team Members, including the ScrumMaster and Product Owner, should understand the high-level technical aspects of the product that is being built.  As well, that understanding should be solid enough, that it can be communicated to other people.  This understanding helps the team members in many situations dealing with each other and with stakeholders.  Understanding the structure of the system is an aspect of Transparency.  This is essential for maintaining overall quality of the product. Development in one part of the product or system should never cause problems for any other part of the product or system.  If team members do not know their product in this way, it can cause significant problems in communication and in how Product Backlog Items are implemented.


Affiliated Promotions:

Try our automated online Scrum coach: Scrum Insight - free scores and basic advice, upgrade to get in-depth insight for your team. It takes between 8 and 11 minutes for each team member to fill in the survey, and your results are available immediately. Try it in your next retrospective.

Please share!
Facebooktwittergoogle_plusredditpinterestlinkedinmailFacebooktwittergoogle_plusredditpinterestlinkedinmail

The Rules of Scrum: PBIs are “slices” through our system (features or functions)

All PBIs completed by the team should be “potentially shippable” increments of complete value.  In order to do this, they must touch all the layers and components of the product so that the functionality produced is truly complete, not just a prototype… a “slice” through the system.  In other words, all of the work that is required for shipping product needs to be completed on all individual PBIs.  Creating slices through our system allows the Scrum team to deliver value each and every Sprint and also allows for the Product Owner to change direction to a new feature if it is more valuable for a future Sprint.  What happens if we don’t create and complete PBIs that are slices through the system?  We risk falling into a pattern of not having a potentially shippable product each Sprint, and, even worse, we may regress into a waterfall type process that produces nothing of value to the customer until the end of the project.


Affiliated Promotions:

Try our automated online Scrum coach: Scrum Insight - free scores and basic advice, upgrade to get in-depth insight for your team. It takes between 8 and 11 minutes for each team member to fill in the survey, and your results are available immediately. Try it in your next retrospective.

Please share!
Facebooktwittergoogle_plusredditpinterestlinkedinmailFacebooktwittergoogle_plusredditpinterestlinkedinmail

Dependecy Injection on J2ME/CLDC devices.

This post is a little geeky and technical and product-related for AgileAdvice, and is a shameless self-promotion. Nevertheless, since testability, test-driven-development, and incremental design are non-exclusive sub-topics of Agile, I though I’d report this here anyway.

Many developers use the Dependency Injection and Inversion of Control (IoC) patterns through such IoC containers as Spring, Hivemind, Picocontainer, and others. They have all sorts of benefits to testability, flexibility, etc. that I won’t repeat here, but can be read about here, here, and here. A great summary of the history of “IoC” can be found here. J2ME developers, however, especially those on limited devices that use the CLDC configuration of J2ME, cannot use the substantial number of IoC/DI containers out there, because they nearly all rely on reflection. These also often make use of APIs not present in the CLDC – APIs which could not easily be added. Lastly there’s a tendency among developers of “embedded software” to be very suspicious of complexity.

In working out some examples of DI as part of a testability workshop at one of my clients, I whipped up a quick DI container, and being the freak that I am, hardened it until it was suitable for production, because I hate half-finished products. So allow me to introduce the Israfil Micro Container. (That is, the Container from the Israfil Micro project). As I mention in the docs, “FemtoContainer” just was too ridiculous, and this container is smaller than pico-container. The project is BSD licensed, and hosted on googlecode, so source is freely available and there’s an issue/feature tracker, yadda yadda.

Essentially I believe that people working on cellphones and set-top boxes shouldn’t be constrained out of some basic software design approaches – you just have to bend the design approach to fit the environment. So hopefully this is of use to more than one of my clients. It currently supports an auto-wiring registration, delayed object creation (until first need), and forthcoming are some basic lifecycle support, and a few other nicities. It does not use reflection (you use a little adapter for object creation instead), and performs quicker than pico-container. Low, low overhead. It’s also less than 10 classes and interfaces (including the two classes in the util project). It’s built with Maven2, so you can use it in any Maven2-built project with ease, but of course you can always also just download the jar (and the required util jar too). Enjoy…

P.S. There are a few other bits on googlecode that I’m working on in the micro-zone. Some minimalist backports of some of java.lang.concurrency (just the locks), as well as some of the java.util.Collections stuff. Not finished, but also part of the googlecode project.


Affiliated Promotions:

Try our automated online Scrum coach: Scrum Insight - free scores and basic advice, upgrade to get in-depth insight for your team. It takes between 8 and 11 minutes for each team member to fill in the survey, and your results are available immediately. Try it in your next retrospective.

Please share!
Facebooktwittergoogle_plusredditpinterestlinkedinmailFacebooktwittergoogle_plusredditpinterestlinkedinmail

More on Scaling Agile

One problem with having multiple teams working on the same project will be the tendency to compare the teams’ performance. Why is this a problem?

Continue reading More on Scaling Agile


Affiliated Promotions:

Try our automated online Scrum coach: Scrum Insight - free scores and basic advice, upgrade to get in-depth insight for your team. It takes between 8 and 11 minutes for each team member to fill in the survey, and your results are available immediately. Try it in your next retrospective.

Please share!
Facebooktwittergoogle_plusredditpinterestlinkedinmailFacebooktwittergoogle_plusredditpinterestlinkedinmail
Berteig
Upcoming Courses
View Full Course Schedule
Advanced Certified ScrumMaster® (A-CSM)
Online
C$1599.00
Jul 26
2019
Details
Team Kanban Practitioner® (TKP)
Toronto
C$1095.00
Jul 31
2019
Details
Certified ScrumMaster® (CSM)
Toronto
C$1395.00
Jul 31
2019
Details
Kanban Management Professional® (KMP II)
Toronto
C$1595.00
Aug 1
2019
Details
Kanban System Design® (KMP I)
Toronto
C$1695.00
Aug 7
2019
Details
Advanced Certified ScrumMaster® (A-CSM)
Online
C$1599.00
Aug 9
2019
Details
BERTEIG Real Agility Series Webinar: Leading to Real Agility
WEBINAR
C$0.00
Aug 12
2019
Details
Certified Scrum Product Owner® (CSPO)
Toronto
C$1695.00
Aug 13
2019
Details
Certified Scrum Professional - ScrumMaster® (CSP-SM)
Online
C$2199.00
Aug 16
2019
Details
Certified ScrumMaster® (CSM)
Toronto
C$1185.75
Aug 21
2019
Details
Advanced Certified ScrumMaster® (A-CSM)
Online
C$1359.15
Aug 30
2019
Details
Kanban System Design® (KMP I)
Toronto
C$1440.75
Sep 10
2019
Details
Certified ScrumMaster® (CSM)
Toronto
C$1185.75
Sep 10
2019
Details
Coach Skills for the Agile Workplace®
Toronto
C$2018.00
Sep 16
2019
Details
Certified Scrum Product Owner® (CSPO)
Toronto
C$1440.75
Sep 18
2019
Details
Team Kanban Practitioner® (TKP)
Toronto
C$930.75
Sep 19
2019
Details
Advanced Certified ScrumMaster® (A-CSM)
Online
C$1359.15
Sep 20
2019
Details
Certified ScrumMaster® (CSM)
Toronto
C$1185.75
Sep 24
2019
Details
Leading SAFe® with SA Certification (+FREE Scaling Workshop)
Toronto
C$1185.75
Oct 1
2019
Details
Professional Scrum Master® (PSM)
Toronto
C$1525.75
Oct 3
2019
Details
Advanced Certified ScrumMaster® (ACSM)
Online
C$1359.15
Oct 4
2019
Details
Certified ScrumMaster® (CSM)
Toronto
C$1185.75
Oct 8
2019
Details
Certified Scrum Product Owner® (CSPO)
Toronto
C$1440.75
Oct 15
2019
Details
Certified ScrumMaster® (CSM)
Toronto
C$1185.75
Oct 22
2019
Details
Kanban System Design® (KMP I)
Toronto
C$1440.75
Oct 24
2019
Details
Advanced Certified ScrumMaster® (A-CSM)
Online
C$1359.15
Oct 25
2019
Details
Team Kanban Practitioner® (TKP)
Toronto
C$930.75
Oct 28
2019
Details
Advanced Certified ScrumMaster® (A-CSM)
Online
C$1359.15
Nov 1
2019
Details
Certified ScrumMaster® (CSM)
Toronto
C$1185.75
Nov 6
2019
Details
Certified ScrumMaster® (CSM)
Toronto
C$1185.75
Nov 19
2019
Details
Advanced Certified ScrumMaster® (A-CSM)
Online
C$1359.15
Nov 22
2019
Details
Certified Scrum Product Owner® (CSPO)
Toronto
C$1440.75
Nov 26
2019
Details
Advanced Certified ScrumMaster® (A-CSM)
Online
C$1359.15
Nov 29
2019
Details
Certified ScrumMaster® (CSM)
Toronto
C$1185.75
Dec 3
2019
Details
Kanban Management Professional® (KMP II)
Toronto
C$1355.75
Dec 5
2019
Details
Advanced Certified ScrumMaster® (A-CSM)
Online
C$1359.15
Dec 6
2019
Details
Team Kanban Practitioner® (TKP)
Toronto
C$930.75
Dec 10
2019
Details
Kanban System Design® (KMP I)
Toronto
C$1440.75
Dec 11
2019
Details
Advanced Certified ScrumMaster® (A-CSM)
Online
C$1359.15
Feb 1
2020
Details
Advanced Certified ScrumMaster® (A-CSM)
Online
C$1359.15
Mar 7
2020
Details
Advanced Certified ScrumMaster® (A-CSM)
Online
C$1359.15
Mar 21
2020
Details